A cumulative flow diagram can show you:
(Choose the best two answers)
A. The total amount of Work in Progress (WIP) for a specific date.
B. The Cycle Time for an item that completed on a specific date.
C. The exact average Cycle Time for all items completed on a specific date.
D. The average Throughput for a specific date range.
正解:A,B
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
Which of the following statements about supplementing Scrum with Kanban practices is true?
(choose the best answer)
A. It applies primarily to maintenance type of work.
B. Scrum Teams may choose to skip the Sprint Planning event.
C. It encourages team collaboration/swarming.
D. It implies that the Scrum Team must have a sequential approach to work.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
Which of the following metrics are likely to be reviewed during flow-based Daily Scrum?
(choose the best two answers)
A. Work Item Age.
B. Velocity.
C. Throughput.
D. Cycle Time.
E. Process control chart and Scrum Team's 85th percentile.
F. Work in Progress (WIP).
G. Lead Time.
正解:A,F
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
When is the most appropriate time for Scrum Teams practicing professional Scrum with Kanban to inspect and adapt their Work in Progress (WIP) Limits?
(choose the best answer)
A. Every day during Daily Scrum.
B. Never. Once set, WIP Limits cannot be modified.
C. Anytime the Developers see fit.
D. During the Sprint Retrospective.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
A Service Level Expectation (SLE) consists of which two items?
(Choose the best two answers)
A. A probability.
B. A period of elapsed days.
C. A forecasted date.
D. A cost of delay.
正解:A,B
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
In the context of Scrum, which of the following statements about Cycle Time are true?
(Choose the best two answers)
A. Cycle Time for some Product Backlog items might be longer than a length of Sprint.
B. Average Cycle Time should be shorter than a length of Sprint.
C. Cycle Time should be exactly the length of a Sprint.
正解:A,B
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
For a specific Sprint Backlog item that has been started, what is the best chart (analytic) to determine when it will be finished?
(choose the best answer)
A. Cumulative Flow diagram (CFD).
B. Throughput Run Chart.
C. Control chart.
D. Work Item Aging Chart.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
Which of the following is NOT a Kanban for Scrum Teams practice?
(choose the best answer)
A. Identifying bottlenecks in your Workflow.
B. Inspecting and adapting Workflow.
C. Visualization of your Workflow.
D. Active management of items in progress.
E. Limiting WIP
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
922 お客様のコメント





Goto -
PSK-I情報量は多いのでそれに関しては満足。分かりやすく解説が載っており良かったですおかげで合格できました