What are the consequences of a confirmation of an operation? (Choose two.)
A. The operation's capacity requirements are reduced.
B. Actual costs are posted for the production confirmed.
C. The produced and confirmed quantity is automatically posted to the warehouse stock as a receipt.
D. Serial numbers are assigned for the confirmed quantity.
正解:A,B
質問 2:
From what point can you no longer use the Read PP master data in the production order?
A. From the release of the production order.
B. After printing the order papers.
C. After the first posting of goods movements or confirmation.
D. After assigning the confirmed quantity of a material component due to carrying out a material availability check.
正解:C
質問 3:
In SAP ECC, you calculate the standard available capacity for a work center capacity with the following data: start: 7:00:00 a.m., end. 3:00:00 p.m., break duration: 1 hour, rate of utilization: 80%, overload. 110%, number of individual capacities: 1.
How large is the standard available capacity?
A. 8 hours
B. 6.16 hours
C. 5.6 hours
D. 7 hours
正解:C
質問 4:
Which of the following efforts can be minimized using the KANBAN procedure?
A. Effort for master data maintenance
B. Organizational effort to stage material
C. Effort for Sales and Operations Planning (SOP)
D. Organizational effort for capacity planning
正解:B
質問 5:
Which of the following statements about ATP (Available To Promise) checks for material components are correct? (Choose two.)
A. ATP checks are mandatory for lead-time scheduling.
B. ATP checks are used to evaluate the free capacity on a certain work center.
C. ATP checks can be carried out automatically when releasing a production order.
D. ATP checks are automatically performed during MRP (Material Requirements Planning) runs.
E. ATP checks can be adjusted to also consider future requirements and receipts.
正解:C,E
質問 6:
Which of the following master data do you need to provide for process manufacturing?
(Choose three.)
A. Serial numbers
B. Resources
C. Master recipe
D. Product cost collector
E. Production versions
正解:B,C,E
質問 7:
An enterprise wants to absorb the uncertainty caused by fluctuating demand for a finished product by means of a buffer variable in SAP ECC. They suggest a dynamic safety stock.
What specifications are used to calculate the dynamic safety stock?
A. The static safety stock per day and the safety time
B. The average daily demand and the desired days supply
C. The static safety stock and a material forecast
D. The average daily demand and the safety time
正解:B