What does the maintenance plan category determine?
A. The type of technical object for the maintenance plan
B. The type of maintenance call object the system generates for a due maintenance call
C. The grouping of similar maintenance plans together for reporting
D. How maintenance call objects are generated for a due maintenance call
正解:B
質問 2:
When a user creates a notification or an order and enters a functional location as the reference object, you want the system to suggest the subordinate equipment automatically.
In addition to setting the reference object view in the order or the notification, what other settings must you make? (Choose two)
A. Set the Equipment-Installation Allowed indicator in the Functional Location master data record.
B. Set the Single Installation indicator in the equipment master data record.
C. Set View Profiles for Technical Objects in Customizing.
D. Set the Single Installation indicator in the Functional Location master data record.
正解:A,D
質問 3:
What are the prerequisites for installing equipment at a functional location? (Choose two)
A. The functional location master record allows the installation.
B. A fixed asset is assigned to the equipment.
C. The equipment category of the equipment allows the installation.
D. A cost center is assigned to the equipment.
正解:A,C
質問 4:
Which of the following combinations must you use to create a single-cycle maintenance plan for an external service?
A. A maintenance order for settlement and an outline agreement
B. A subcontract purchase order and an outline agreement
C. A framework order and a subcontract purchase order
D. A framework order and a maintenance order for settlement
正解:D
質問 5:
You have selected Confirmation Required in the control key for operations in a maintenance order. One of the operations is already partially confirmed.
Which system statuses can the order header display before all operations are finally confirmed? (Choose three)
A. TECO
B. PCNF
C. CNF
D. CLSD
E. CRTD
正解:A,B,D
質問 6:
Your customer wants to use the dynamic availability check for stock material.
What data must you use to create a scope for the check?
A. Checking group and material type
B. Checking group and checking rule
C. Checking rule and material type
D. Checking rule and material group
正解:B
質問 7:
Your customer wants to utilize estimated costs in Plant Maintenance orders.
Which condition does the customer need to be aware of?
A. Planned costs must not exceed the estimated costs.
B. A specific order type in which cost estimates are activated must be used.
C. Planned costs overwrite estimated costs after release of the order.
D. Upon release of the order, estimated costs cannot be revised.
正解:D
質問 8:
Where do you define initial and subsequent buffers for the maintenance plan strategy?
A. In the maintenance item
B. In the maintenance plan scheduling parameters
C. In the maintenance plan category settings
D. In the maintenance package for the maintenance strategy
正解:D
質問 9:
How are the planned costs for the refurbished part or parts displayed in the planned/actual order report?
A. As costs with a positive value
B. As revenue with a negative value
C. As revenue with a positive value
D. As costs with a negative value
正解:D
1604 お客様のコメント





榎本** -
C_TPLM30_65復習教材は私の多くの時間を節約しました。そして、C_TPLM30_65試験に合格しました。ありがとう!