最新なSAP C_S43_2601問題集(12題)、真実試験の問題を全部にカバー!

Pass4Testは斬新なSAP SAP Certified Application Associate C_S43_2601問題集を提供し、それをダウンロードしてから、C_S43_2601試験をいつ受けても100%に合格できる!一回に不合格すれば全額に返金!

  • 試験コード:C_S43_2601
  • 試験名称:SAP Certified Implementation Consultant - SAP S/4HANA Cloud Private Edition, Asset Management (C_S43_2601)
  • 問題数:12 問題と回答
  • 最近更新時間:2026-10-04
  • PDF版 Demo
  • PC ソフト版 Demo
  • オンライン版 Demo
  • 価格:12900.00 5999.00  
質問 1:
Use Phase-Based Maintenance Processing
The project team evaluates during the implementation project Phase-Based Maintenance Processing in SAP S
/4HANA Asset Management. The following features need to be checked:
* Initiate and screen a Maintenance Notification
* Plan Maintenance Order and send it for approval
* Create a Maintenance Notification using an already available notification type which is suitable for phase-based maintenance and save it.
Use the following data:

* Screen and accept the just created Maintenance Notification.
* Create an Order (Phase-based) for your accepted notification and submit it for approval.
Use the following data:

正解:
See the Explanation for complete Solution of this Task.
Explanation:
Task 10 Overview
This task evaluates your ability to manage the newer, phase-led maintenance workflow in SAP S/4HANA.
Unlike the traditional "emergency" repair you did earlier, this process includes formal screening and approval steps Step 1: Create a Phase-Based Maintenance Notification In this step, you initiate the request.
* Access the Transaction : Use transaction IW21 or the Fiori app Create Maintenance Request .
* Select Notification Type : Use a type configured for phase-based maintenance (typically Y1 - Maintenance Request ).
* Enter the Following Data :
* Technical Object : T-PB48
* Description : Defective pump (phase-based)
* Current Location : Production Line 1
* Detection Method : Continuous Condition Monitoring
* Operational Effect : Production restricted
* Save : Note the notification number generated.
Explanation : This step "initiates" the maintenance process. In phase-based maintenance, the notification starts in the Initiation phase, where it must be reviewed before any work is planned.
Step 2: Screen and Accept the Notification
As a "Maintenance Coordinator," you must now review the request.
* Access the Fiori App : Open Screen Maintenance Requests .
* Locate Your Notification : Find the notification you just created for T-PB48.
* Perform Screening :
* Review the details to ensure they are complete.
* Click Accept to move it to the next phase.
Explanation : "Screening" is a quality gate. It ensures that the maintenance team only spends time planning valid, well-described issues. Once accepted, the notification moves from the Initiation phase to the Screening phase and finally becomes available for planning.
Step 3: Create and Plan the Phase-Based Order
Now you will create the formal work order for the accepted request.
* Create Order : From within the accepted notification, or using the Manage Maintenance Backlog app, choose to Create Order .
* Enter Planning Data :
* Technical Object : T-PB48
* Operation 0010 Description : Repair damage
* Operation 0010 Work : 2 h
* Submit for Approval : Look for the Submit for Approval button at the top of the order screen.
Explanation : This step moves the order into the Planning phase. By submitting it for approval, you are requesting the budget and resources to perform the work. The order status will change to indicate it is
"Waiting for Approval"

質問 2:
Task 4: Configure and create Technical Objects
The project team evaluates during the implementation project Technical Object structures in SAP S/4HANA Asset Management. The following features need to be checked:
* Configure and create Functional Locations
* Create, serialize and install Equipment
* Create Functional Location master record ZZ0##-01 and save it. Use the following information:

* Create Equipment master record EQUI-## and save it. Use the following information:

* Serialize the just created Equipment master record EQUI-## . Use the following data:

* Install Equipment EQUI-## at the Functional Location 00-01-ASS-02 .
正解:
See the Explanation for complete Solution of this Task.
Explanation:
Task 4: Configure and create Technical Objects
This task evaluates your ability to structure and manage the physical and functional hierarchy of assets in SAP S/4HANA Asset Management.
Step 1: Create Functional Location Master Record
A Functional Location represents the area at which a maintenance task is to be performed.
* Access the Transaction : Use transaction code IL01 (Create Functional Location).
* Enter Initial Data :
* Functional Location : ZZ048-01.
* Structure Indicator : ZZ48.
* Functional Location Category : T.
* Press Enter .

* Enter General Data :
* Description : Production Line Z48.
* Enter Location and Organization Data :
* Maintenance Plant : 1020.
* Cost Center : 4110.
* Planning Plant : 1020.
* Planner Group : Z48.
* Main WorkCtr : T-ME48.
* Work Center Plant : 1010.
* Save : Click the Save icon.
Explanation : By creating this record, you define a specific functional area within Plant 1020 where maintenance costs and history will be tracked for all equipment installed there.


Step 2: Create Equipment Master Record
Equipment represents an individual physical object that is maintained as an autonomous unit.
* Access the Transaction : Use transaction code IE01 (Create Equipment).
* Enter Initial Data :
* Equipment : EQUI-48.
* Equipment Category : T.
* Press Enter .

* Enter General Data :
* Description : Drive Motor GR48.
* Save : Click the Save icon.
Explanation : This step creates a master record for a physical asset-a drive motor-allowing you to track its individual lifecycle, independent of where it is currently installed.


Step 3: Serialize the Equipment
Serialization links a piece of equipment to a specific material and unique serial number for inventory management and tracking.
* Access the Transaction : Use transaction code IE02 (Change Equipment) and enter EQUI-48.
* Navigate to Serial Data : Go to the SerData (Serial Data) tab.
* Enter Serialization Data :
* Material : T-PM8000.
* Serial Number : EQUI-48.
* Save : Click the Save icon.
Explanation : Linking the motor to Material T-PM8000 enables the system to track this specific asset as a serialized part, which is essential for warehouse movements and warranty tracking.

Step 4: Install Equipment at a Functional Location
This establishes the relationship between the physical asset (Equipment) and the functional area where it is operating.
* Access the Transaction : Use transaction code IE02 (Change Equipment) for EQUI-48.
* Modify Installation Location :
* Click on the Structure tab.
* Find the FunctLoc field.
* Enter the location: 00-01-ASS-02.
* Save : Click the Save icon.
Explanation : This installation "plugs" your drive motor into the functional hierarchy at location 00-01-ASS-02. From this point forward, any maintenance performed on this motor will be automatically associated with that location's history.

一年間無料で問題集をアップデートするサービスを提供します。

弊社の商品をご購入になったことがあるお客様に一年間の無料更新サービスを提供いたします。弊社は毎日問題集が更新されたかどうかを確認しますから、もし更新されたら、弊社は直ちに最新版のC_S43_2601問題集をお客様のメールアドレスに送信いたします。ですから、試験に関連する情報が変わったら、あなたがすぐに知ることができます。弊社はお客様がいつでも最新版のSAP C_S43_2601学習教材を持っていることを保証します。

弊社のSAP Certified Application Associate問題集を利用すれば必ず試験に合格できます。

Pass4TestのSAP C_S43_2601問題集はIT認定試験に関連する豊富な経験を持っているIT専門家によって研究された最新バージョンの試験参考書です。SAP C_S43_2601問題集は最新のSAP C_S43_2601試験内容を含んでいてヒット率がとても高いです。Pass4TestのSAP C_S43_2601問題集を真剣に勉強する限り、簡単に試験に合格することができます。弊社の問題集は100%の合格率を持っています。これは数え切れない受験者の皆さんに証明されたことです。100%一発合格!失敗一回なら、全額返金を約束します!

弊社のC_S43_2601問題集のメリット

Pass4Testの人気IT認定試験問題集は的中率が高くて、100%試験に合格できるように作成されたものです。Pass4Testの問題集はIT専門家が長年の経験を活かして最新のシラバスに従って研究し出した学習教材です。弊社のC_S43_2601問題集は100%の正確率を持っています。弊社のC_S43_2601問題集は多肢選択問題、単一選択問題、ドラッグ とドロップ問題及び穴埋め問題のいくつかの種類を提供しております。

Pass4Testは効率が良い受験法を教えてさしあげます。弊社のC_S43_2601問題集は精確に実際試験の範囲を絞ります。弊社のC_S43_2601問題集を利用すると、試験の準備をするときに時間をたくさん節約することができます。弊社の問題集によって、あなたは試験に関連する専門知識をよく習得し、自分の能力を高めることができます。それだけでなく、弊社のC_S43_2601問題集はあなたがC_S43_2601認定試験に一発合格できることを保証いたします。

行き届いたサービス、お客様の立場からの思いやり、高品質の学習教材を提供するのは弊社の目標です。 お客様がご購入の前に、無料で弊社のC_S43_2601試験「SAP Certified Implementation Consultant - SAP S/4HANA Cloud Private Edition, Asset Management (C_S43_2601)」のサンプルをダウンロードして試用することができます。PDF版とソフト版の両方がありますから、あなたに最大の便利を捧げます。それに、C_S43_2601試験問題は最新の試験情報に基づいて定期的にアップデートされています。

弊社は無料でSAP Certified Application Associate試験のDEMOを提供します。

Pass4Testの試験問題集はPDF版とソフト版があります。PDF版のC_S43_2601問題集は印刷されることができ、ソフト版のC_S43_2601問題集はどのパソコンでも使われることもできます。両方の問題集のデモを無料で提供し、ご購入の前に問題集をよく理解することができます。

簡単で便利な購入方法:ご購入を完了するためにわずか2つのステップが必要です。弊社は最速のスピードでお客様のメールボックスに製品をお送りします。あなたはただ電子メールの添付ファイルをダウンロードする必要があります。

領収書について:社名入りの領収書が必要な場合には、メールで社名に記入して頂き送信してください。弊社はPDF版の領収書を提供いたします。

SAP C_S43_2601 試験シラバストピック:

セクション比重目標
組織単位とマスタデータ11%-20%- Enterprise Structure
  • 1. Work Centers
  • 2. Planner Groups
  • 3. Maintenance Plant
  • 4. Planning Plant
予防保全11%-20%- Maintenance Planning
  • 1. Scheduling Parameters
  • 2. Call Objects
  • 3. Maintenance Plans
  • 4. Maintenance Strategies
再生および予備部品処理1%-10%- Spare Parts Management
  • 1. Refurbishment Orders
  • 2. Inventory Integration
統合と拡張性1%-10%- Cross-Application Integration
  • 1. Project System Integration
  • 2. Finance Integration
  • 3. Materials Management Integration
保全処理21%-30%- Maintenance Execution
  • 1. Order Scheduling
  • 2. Maintenance Orders
  • 3. Notifications
  • 4. Order Completion
  • 5. Order Planning
分析とレポート1%-10%- Reporting Capabilities
  • 1. Embedded Analytics
  • 2. KPIs and Monitoring
  • 3. Maintenance Reporting
Technical Objects11%-20%- Technical Object Master Data
  • 1. Measuring Points and Counters
  • 2. Equipment
  • 3. Functional Locations
  • 4. Bills of Material
ユーザーエクスペリエンスと SAP Fiori1%-10%- SAP Fiori Applications
  • 1. Mobile Maintenance
  • 2. Launchpad Configuration
  • 3. Maintenance Processing Apps

SAP Certified Implementation Consultant - SAP S/4HANA Cloud Private Edition, Asset Management (C_S43_2601) 認定 C_S43_2601 試験問題:

問題 #1

Use Phase-Based Maintenance Processing
The project team evaluates during the implementation project Phase-Based Maintenance Processing in SAP S
/4HANA Asset Management. The following features need to be checked:
* Initiate and screen a Maintenance Notification
* Plan Maintenance Order and send it for approval
* Create a Maintenance Notification using an already available notification type which is suitable for phase-based maintenance and save it.
Use the following data:

* Screen and accept the just created Maintenance Notification.
* Create an Order (Phase-based) for your accepted notification and submit it for approval.
Use the following data:

解答を表示  ディスカッション  0

正解:

See the Explanation for complete Solution of this Task.
Explanation:
Task 10 Overview
This task evaluates your ability to manage the newer, phase-led maintenance workflow in SAP S/4HANA.
Unlike the traditional "emergency" repair you did earlier, this process includes formal screening and approval steps Step 1: Create a Phase-Based Maintenance Notification In this step, you initiate the request.
* Access the Transaction : Use transaction IW21 or the Fiori app Create Maintenance Request .
* Select Notification Type : Use a type configured for phase-based maintenance (typically Y1 - Maintenance Request ).
* Enter the Following Data :
* Technical Object : T-PB48
* Description : Defective pump (phase-based)
* Current Location : Production Line 1
* Detection Method : Continuous Condition Monitoring
* Operational Effect : Production restricted
* Save : Note the notification number generated.
Explanation : This step "initiates" the maintenance process. In phase-based maintenance, the notification starts in the Initiation phase, where it must be reviewed before any work is planned.
Step 2: Screen and Accept the Notification
As a "Maintenance Coordinator," you must now review the request.
* Access the Fiori App : Open Screen Maintenance Requests .
* Locate Your Notification : Find the notification you just created for T-PB48.
* Perform Screening :
* Review the details to ensure they are complete.
* Click Accept to move it to the next phase.
Explanation : "Screening" is a quality gate. It ensures that the maintenance team only spends time planning valid, well-described issues. Once accepted, the notification moves from the Initiation phase to the Screening phase and finally becomes available for planning.
Step 3: Create and Plan the Phase-Based Order
Now you will create the formal work order for the accepted request.
* Create Order : From within the accepted notification, or using the Manage Maintenance Backlog app, choose to Create Order .
* Enter Planning Data :
* Technical Object : T-PB48
* Operation 0010 Description : Repair damage
* Operation 0010 Work : 2 h
* Submit for Approval : Look for the Submit for Approval button at the top of the order screen.
Explanation : This step moves the order into the Planning phase. By submitting it for approval, you are requesting the budget and resources to perform the work. The order status will change to indicate it is
"Waiting for Approval"

問題 #2

Create a Task List
The project team evaluates during the implementation project Task Lists in SAP S/4HANA Asset Management. The following features need to be checked:
* Create a Task List header
* Create Task List operations
* Create a Task List with 3 Task List operations. Maintenance Strategy Z## comprises Maintenance Packages with different hierarchy levels.
Use the following information at header level of the Task List:

Use the following information for each Task List operation:

* Assign Maintenance Packages to the Task List Operations as follows:
* Operation 10 is to be performed monthly.
* Operation 20 is to be performed every 4 months.
* Operation 30 is to be performed every 12 months.

解答を表示  ディスカッション  0

正解:

See the Explanation for complete Solution of this Task.
Explanation:
Since we encountered that error with the Z48 strategy , we must ensure that is fixed before we can finish the Task List. Here is the complete, verified, step-by-step process to finalize Task 7 , including the "hidden" pre- requisite.
Task 7: Create a General Task List
Objective : To create a standardized template of maintenance steps that can be automatically pulled into future work orders based on a schedule.
Step 1: The Pre-requisite (Fixing Strategy Z48)
If you haven't done this yet, SAP will not let you save the Task List.
* Transaction : IP11 (Maintain Maintenance Strategies).
* Action : Click New Entries .
* Strategy : Z48
* Description : Strategy for Group 48
* Strategy Unit : MON (Months).
* Packages : On the left, double-click Packages , then click New Entries :
* Line 1 : Cycle 1 / Unit MON / Text Monthly
* Line 2 : Cycle 4 / Unit MON / Text Every 4 Months
* Line 3 : Cycle 12 / Unit MON / Text Yearly
* Save (Floppy Disk icon).
Explanation : A strategy is the "calendar" that defines how often work happens. Without this, the system doesn't know what "Monthly" or "Yearly" means.
Step 2: Create Task List Header
* Transaction : IA05 .
* Initial Screen : Group TL-48, Group Counter 1. Press Enter .
* Header Fields :
* Description : Regular Maintenance GR48
* Planning Plant : 1010
* Work Center : MK-00 / Plant : 1010
* Usage : 4 (Plant Maintenance)
* Status : 4 (Released)
* Planner Group : P48
* Maint. Strategy : Z48
Explanation : The header defines who is responsible for the work (Planner Group P48) and which scheduling rules (Strategy Z48) apply to the whole list.
Step 3: Create Operations
* Click the Operations button (F6) at the top.
* Enter three rows with this data:
* Op 10 : Work Center MK-00, Plant 1010, Control Key PM01, Work 30, Unit MIN.
* Op 20 : (Same as above).
* Op 30 : (Same as above).
Explanation : Operations are the actual steps the technician follows. Here, we are saying each step takes 30 minutes of mechanical labor.
Step 4: Assign Maintenance Packages (The "Frequencies")
This is the most important part of Task 7. We tell SAP which operation happens when.
* Select Row 10 (click the box at the far left of the row).
* Go to Menu: Goto > Maintenance Packages .
* Check the box for the 1 Month package. Click the Back (Green Arrow) icon.
* Select Row 20 .
* Go to Goto > Maintenance Packages and check the 4 Month package. Click Back .
* Select Row 30 .
* Go to Goto > Maintenance Packages and check the 12 Month package. Click Back .
Explanation : Now, SAP knows that Op 10 happens every month, but Op 30 only happens once a year.
Step 5: Save
* Click the Save icon.
* The message at the bottom should say: "Task list TL-48 saved with group counter 1" .

991 お客様のコメント最新のコメント

未来 - 

試験の内容にほぼあってて凄すぎた。Pass4Testさんほんとうにありがとぅーす

Asai - 

Pass4Testお陰様でいい問題集を出会いました。感謝です。

木下** - 

C_S43_2601参考書役に立ちました。間違いの選択肢の解説もよく入っていて、すごくわかりやすいです。

Tajima - 

これC_S43_2601をおさえておけば得点アップにつながることは間違いないっす

Mirai - 

通勤・通学中などのすき間学習に便利なアプリバージョンもあるから超助かった。C_S43_2601問題集ナンバーワン

堀田** - 

またお世話になってます。C_S43_2601に合格しました。ここで感謝致します。当に使えて、間違った答えをすべて覚えやすくなっています。

朝*遥 - 

C_S43_2601の試験に受かりました!!Pass4Test本当に有難うございます!

青山** - 

C_S43_2601試験を合格しました。よかったんです。
引き続き問題集を購入していきたいと思います。
今後ともよろしくお願いします。

Amano - 

過去問にチャレンジ → いざ本番! という流れです。
個人的には、非常に読みやすく、ストレスなく勉強を続けられました

天野** - 

C_S43_2601試験対策のテキストです。内容もしっかりしているし、かなりコスパが高いです。

Asada - 

本書はC_S43_2601になじみのないかたでも理解しやすいように、身近なところから順番に学習できるようになっている点も良い点です。

Kuribayashi - 

先週C_S43_2601認定資格を取得しました。Pass4Test様がかなり実力をつけてくださったおかげだと思います。心から感謝します。

由良** - 

全ての問題を暗記して、早速受験してみて、二つも無事に合格したよ。詳細な解説だお気に入りです。

Takase - 

短時間での効率よい学習が可能。みっかでC_S43_2601合格だ。Pass4Testまたきますね

长谷** - 

C_S43_2601参考書を読み続けるのがつらいという方にとっても、社会人前に呼んでおくのもいいなと思いました。

メッセージを送る

あなたのメールアドレスは公開されません。必要な部分に * が付きます。

Pass4Test問題集を選ぶ理由は何でしょうか?

品質保証

Pass4Testは試験内容に応じて作り上げられて、正確に試験の内容を捉え、最新の97%のカバー率の問題集を提供することができます。

一年間の無料アップデート

Pass4Testは一年間で無料更新サービスを提供することができ、認定試験の合格に大変役に立ちます。もし試験内容が変われば、早速お客様にお知らせします。そして、もし更新版がれば、お客様にお送りいたします。

全額返金

お客様に試験資料を提供してあげ、勉強時間は短くても、合格できることを保証いたします。不合格になる場合は、全額返金することを保証いたします。

ご購入の前の試用

Pass4Testは無料でサンプルを提供することができます。無料サンプルのご利用によってで、もっと自信を持って認定試験に合格することができます。