A customer is migrating from POWERS 520 to a POWER7 720. The migration includes the transfer of IBM i Licensed Program Products, and both systems need to run in parallel production for 30 days.
Which action supports this requirement?
A. Use temporary CBU keys during the migration period
B. Request temporary migration keys
C. Include IBM Temporary Software License for i product in the configuration
D. On/Off Capacity on Demand Licensing
正解:C
質問 2:
A customer running IBM i VSR4MO on a POWERS 520 is considering purchasing a POWER7+720. What steps should be performed as part of the upgrade/migration process?
A. Run ANZOBJCVN on their current V5R4M0 system to identity potential program issues.
B. Upgrade to 6.1 Run ANZOBJCVN to determine if the customer can upgrade to IBM i 7.1
C. Upgrade the current machine to 6.1
Run ANZOBJCVN
Then upgrade to 7.1 to support the new hardware
D. Upgrade to V5R4M5
Run STROBJC VN to prepare programs for 7.1.
正解:A
質問 3:
Which of the following is a benefit of redundant cache on a SAS disk adapter?
A. Improved performance
B. Hot-spare protection
C. Multipath support
D. Disk level mirroring
正解:A
質問 4:
What was the primary reason why VIO Server was introduced for IBM i environments?
A. To deal with industry standard formatted external storage
B. To provide Shared Ethernet Adapter
C. To provide vSCSl
D. To provide NPIV
正解:A
質問 5:
Which console type provides the ability to accept commands in a command line interface (CLI) to perform resource movements?
A. Advanced System Management Interface (ASMI)
B. Hardware Management Console (HMC)
C. Operations Navigator
D. LAN Console
正解:B
質問 6:
Which of the following configurations will require an HMC?
A. POWER7+740 Five IBM i 7.1 LPARs Full Enterprise Enablement feature
B. POWER7+710 IBM i 7.1 LPARs One Enterprise Enablement feature
C. POWER7+730 Four IBM i 7.1 LPAR Full Enterprise Enablement feature
D. POWER7+720 IBM i LPARs On/Off Capacity on Demand
正解:A
三井** -
A4040-226試験に合格できる分は大きいと思います.
初学者も再挑戦者も効率的に学習を進められます!