Which two actions take place when an active NSX Edge instance fails? (Choose two.)
A. Once the original NSX Edge instance is recovered, it preempts the other NSX Edge instance and takes over the active role.
B. The standby NSX Edge instance becomes the active instance and retains any routing neighbor adjacencies.
C. Once the original NSX Edge instance is recovered, the NSX Manager attempts to place it on a different host from the other NSX Edge instance.
D. The standby NSX Edge instance becomes the active instance and requests routing updates from the routing neighbors.
正解:B,C
質問 2:
Where are the distributed NSX firewall decisions logged?
A. vCenter Server
B. ESXi host
C. NSX Edge
D. NSX Manager
正解:B
質問 3:
What is the minimum MTU size recommended by VMware for the physical network when deploying NSX for vSphere?
A. 2148
B. 1550
C. 1600
D. 9000
正解:C
質問 4:
A vSphere administrator wants to add a VLAN LIF to a Distributed Router. What must the vSphere administrator do for the VLAN LIF to be added successfully?
A. The vSphere administrator must assign a VLAN number to the distributed portgroup that the VLAN LIF connects to.
B. The vSphere administrator must assign a VLAN number to the Logical Switch that the Distributed Router connects to.
C. The vSphere administrator must assign a VLAN number to the uplink on the distributed switch that the VLAN LIF connects to.
D. The vSphere administrator must assign a VLAN number to the Distributed Router that the Logical Switch connects to.
正解:A
質問 5:
Which NSX Data Security role has the permission to start and stop data security scans?
A. NSX Administrator
B. Security Administrator
C. Auditor
D. Enterprise Administrator
正解:A
質問 6:
Which NSX component can validate that security policies at your organization are being enforced correctly?
A. Activity Monitoring
B. Flow Monitoring
C. ERSPAN
D. Distributed firewalls
正解:A
質問 7:
Where is the layer 2 bridge instance deployed when configuring a bridge connection between a logical switch and a VLAN?
A. On both ESXi hosts that make up the layer 2 bridge
B. On the ESXi host running the logical switch
C. On the ESXi host running the logical router
D. On each virtual machine that will utilize the layer 2 bridge
正解:C
南*ほ -
過去問で1週間で合格できた。VCAN610初心者ですが三日これを使って合格ってすごくない?!本当にありがとうございます