Which of the following activities are part of the Acting phase of a test improvement cycle?
1. Set Priorities
2. Create Solutions
3. Plan Actions
4. Pilot Solutions
A. 1 and 3
B. 2 and 4
C. 1 and 2
D. 2, 3 and 4
正解:B
質問 2:
Which of the following statements regarding the CMMI is FALSE?
A. In the staged representation there is no fixed set of levels or stages to proceed through.
B. In the continuous representation there is no fixed set of levels or stages to proceed through.
C. An organization applying the continuous representation can select areas for improvement from different categories.
D. CMMI has both a staged and continuous representation.
正解:A
質問 3:
A test process assessment has been performed at an embedded software organization. All process areas at TMMi Levels 2 and 3 were in scope of the assessment. Many practices required by the TMMi model are already in place, but the organization is missing a master test plan spanning multiple test levels.
Which of the following process areas would most likely need specific attention to address the above-mentioned shortcoming?
A. Test Organization
B. Test Life Cycle and Integration
C. Test Policy and Strategy
D. Test Planning
正解:B
質問 4:
Consider the following characteristics of an assessment:
* the assessment is performed by an accredited TMMi assessor.
* only interviews are used as evidence.
To which type of assessment do these characteristics relate?
A. Informal assessments
B. Formal assessments
C. Both formal and informal assessments
D. Neither formal nor informal assessments based on TAMAR
正解:A
質問 5:
An organization is facing too many defects occurring during production. As a consequence, an important test improvement goals for the next improvement cycle is to improve the quality (effectiveness) of the test cases.
Which of the following specific practices needs to be addressed, in the context of the improvement goal, as part of SG 1 "Perform Test Analysis and Design using Test Design Techniques" of the Test Design and Execution process area?
A. Specify Intake Test Procedure
B. Develop and Prioritize Test Procedures
C. Identify and Prioritize Test Charters
D. Identify and Prioritize Test Conditions
正解:D
質問 6:
During a TMMi assessment the percentage of process achievement for the Test Planning process area has been determined at 40%.
Which of the following compliance ratings would you assign to Test Planning?
A. Not achieved
B. Partly achieved
C. Fully Achieved
D. Largely achieved
正解:B
質問 7:
A test process assessment has been performed on a company developing systems for the medical industry.
Their systems are classified as safety critical. One of the shortcomings identified during the assessment is related to reliability testing. Although reliability was identified by the business as a critical issue, no formal approach and test techniques are being used for reliability testing.
Which of the following process areas would need specific attention to address the above mentioned shortcoming?
A. Test Environment
B. Product Quality Evaluation
C. Test Design and Execution
D. Non-Functional Testing
正解:D
質問 8:
What is the correct order for the following TMMi maturity levels (from low to high maturity)?
A. Defined, Measured, Managed
B. Managed, Defined, Measured
C. Defined, Managed, Measured
D. Managed, Measured, Defined
正解:B