What is a key consideration when replacing the repository disk in a PowerHA cluster?
A. Only repository disks smaller than the original are supported for replacement.
B. The replacement should be done during peak cluster activity to assess its impact.
C. All nodes must be able to access the new disk before it becomes active.
D. The new disk must have a different size than the original to improve performance.
正解:C
質問 2:
How does PowerHA integrate with the AIX Error Notification Facility?
A. By ignoring all AIX error notifications to prioritize cluster stability
B. By using AIX error notifications to trigger PowerHA events
C. By preventing any AIX errors from being logged
D. By automatically correcting all AIX errors without logging them
正解:B
質問 3:
How does the PowerHA GUI assist with log consolidation?
A. By providing a single view/interface to analyze multiple log files
B. By converting text logs to graphical formats for easier interpretation
C. By deleting outdated log files to free up space
D. By automatically emailing logs to the system administrator
正解:A
質問 4:
How can an administrator check the status of all nodes in a PowerHA SystemMirror cluster?
A. By logging into the IBM Cloud PowerVC Manager
B. By querying each node individually
C. By running the clstat command
D. By using the lscluster command
正解:C
質問 5:
What is involved in managing file collections within a PowerHA cluster?
A. Keeping track of all file operations for audit purposes
B. Archiving deleted files for compliance monitoring
C. Organizing and maintaining configuration files and scripts
D. Monitoring the real-time changes to files across all nodes
正解:C
質問 6:
What does the resource start-up order affect in a PowerHA cluster environment?
A. The speed at which all network switches operate
B. The sequence and method in which resources are activated
C. The licensing model of the PowerHA software
D. The priority of user access to the cluster
正解:B
質問 7:
Which approach should be used to ensure minimal disruption to services when planning an HA solution using PowerHA SystemMirror?
A. Limiting the use of redundant hardware components
B. Scheduling regular manual failover tests
C. Configuring automated failover for resource groups
D. Centralizing the control of all cluster nodes
正解:C
質問 8:
During the architectural planning of a PowerHA SystemMirror solution, what should be addressed to eliminate single points of failure and ensure robust disaster recovery? (Choose Three)
A. Single user administration
B. Network interface redundancy
C. Automated failback capabilities
D. Diverse routing paths
E. Cluster-aware application design
正解:B,C,D
西尾** -
驚きました!短い時間で、S1000-008試験参考書を利用したら、無事にS1000-008試験に合格しました!