You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
A. Apply the recommendations of the simplification list
B. Run the database migration to the SAP HANA database
C. Perform the migration of data into the new data structure
D. Check the compatibility of custom code with SAP S/4HANA
正解:A,D
質問 2:
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
A. AA
B. The link to different patch levels to SUM
C. The corrections to the SUM Guide
D. An overview about possible upgrade paths
正解:B,C,D
質問 3:
ICNV initialization does 3
A. Creation of flag
B. Creation of views
C. AA
D. Build index on flag column
正解:A,B,D
質問 4:
In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?
There are 2 correct answers to this question.
Response:
A. SAP S/4HANA conversion to SAP S/4HANA 1709
B. Upgrading to SAP ECC 6.08 without using DMO
C. Updating to SAP ECC 6.07 using DMO
D. Using DMO when applying Support Packages to SAP ECC 6.07
正解:A,B
質問 5:
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step
"Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
A. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
B. The SAP Support Packages contained in the upgrade media
C. The SAP Support Packages that will be bound to the upgrade
D. The SAP Support Packages found in the download directory
正解:D