What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.
A. Material to production version assignment
B. Material to bill of materials (BOM) assignment
C. Material to routing assignment
D. Routing to sequence assignment
E. Component assignment
正解:B,C,E
質問 2:
You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.
A. Infinite sequencing
B. Forward with reverse
C. Backwards
D. Squeezing in
正解:B,C
質問 3:
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
A. The previously dispatched operation stays as is the new operation is inserted after the dispatched operation.
B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
C. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
D. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
正解:B
質問 4:
Which task list types can have parallel sequences? There are 2 correct answers to this question.
A. Rate routings (R)
B. Routings (N)
C. Master recipes (2)
D. Reference operation sets (S)
正解:A,B
質問 5:
What new technology is used in SAP S/4HANA Embedded Analytics? Please choose the correct answer.
A. Multid imensional Reporting client (MDRC)
B. Smart Business Cockpit
C. HANA Live
D. ABAP Managed Core Data Services (CDS)
正解:D
質問 6:
During production order creation, several valid production versions are found. How does the system choose the product conversion?
A. Validity period or sales order
B. Planned order or material number
C. Lot size or material cost
D. Alphanumeric or quota arrangement
正解:D
質問 7:
Your company produces a finished good based on a forecast and expects it to being stock when customers order it. If customers order more than the forecasted quantity, the production quantity should be increased to try to meet the extra demand. Which planning strategy do you use?
A. Make-to-order production (20)
B. Planning with final assembly (40)
C. Make-to-stock production (10)
D. Planning without final assembly (50)
正解:B
質問 8:
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?
A. Consumption-based planning
B. Manual planning without check
C. Material requirements planning
D. Forecast planning
正解:A
質問 9:
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
A. Assign planned orders manual lying the planning table.
B. Run MRP with quota arrangement.
C. Run MRP with automatic selection of production version.
D. Run PP/DS heuristics for repetitive manufacturing.
正解:B,D