You want to assign a maintenance planning plant directly to an organizational unit. Which of the following units can you use?
A. Maintenance work center
B. Controlling area
C. Maintenance planner groups
D. Location
正解:C
質問 2:
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100%. Which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
A. Technical completion date of the maintenance order
B. Planned date of the next call, independent of maintenance orderdates
C. Date of the final time confirmation
D. Planned end date of the maintenance order
正解:A
質問 3:
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question.
A. Shift factors
B. Scheduling period
C. Start counter reading
D. Estimated annual performance
正解:C,D
質問 4:
Which of the following BOMs we use to set up spare parts planning of functional locations
A. Costing BOM
B. construction BOM
C. Maintenance BOM
D. Production BOM
正解:C
質問 5:
What is the goal of embedded analytics in SAP S/4HANA?
A. Integrate SAP BW into SAP S/4HANA.
B. Combine transactional and analytical processing.
C. Combine the HANA database with SAP BW InfoProviders.
D. Integrate SAP BusinessObjects Business Intelligence into SAP S/4HANA.
正解:B
質問 6:
In which of the following locations can object information can be found
A. In document
B. In Order
C. Din master record of technical object
D. In Notification
正解:B
質問 7:
What are the prerequisites to serialize a piece of equipment? Note:There are 3 correct answers to this question.
A. Add a serialized material to the construction type field of the equipment master.
B. Assign a serial number profile to the equipment category.
C. Assign a serial number profile to the related material master.
D. Maintain a serial number for an existing equipment master.
E. Add a serialized material to the equipment serial data view.
正解:A,C,E
質問 8:
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question.
A. Calculation key
B. Capacity category
C. Fixed price of the activity type
D. Organizational unit (HR)
正解:B,D
質問 9:
Which of the following statements about SAP Asset Manager aretrue? Note: There are 3 correct answers to this question.
A. SAP Asset Manager is available for Windows platform.
B. SAP Asset Manager can be used offline.
C. SAP Asset Manager is available for SAP S/4HANA and SAPERP.
D. SAP Asset Manager can run on smart watches.
E. SAP Asset Manager can be used offline.
正解:B,C,E