Which of the following does the system automatically do when you complete a stability? Correct 3
A. Trigger a subsequent stability Study
B. Lock the test schedule
C. Set the usage decision for all stability inspection lots
D. Lock all the storage conditions
E. Set the system status to completed
正解:B,D,E
質問 2:
Which of the following documents can you use as a reference document when creating a standard internal notification?
A. Sales order
B. Purchasing order
C. Material Document
D. Production Order
正解:D
質問 3:
Which following inspection origin are directly related to sale and distribution (SD) functions 3 correct answers
A. Goods issue
B. General delivery
C. Good receipts
D. Delivery to customer with customer order
E. Plant maintenance
正解:B,C,D
質問 4:
Which business object must you use to create a stability study?
A. Physical sample
B. Sample drawing procedure
C. Quality notification
D. Quality inspection lot
正解:C
質問 5:
For what type of cost collector does an inspection lot capture appraisal and non conformity costing?
A. A quality Notification
B. A controlling general ledger
C. A company code general ledger
D. A quality management order
正解:D
質問 6:
You create a supplier claim notification with reference to material document year, number and item from a goods receipt for the PO. What information is copied to the notification? Note : 3 correct answer
A. Advanced Shipping number
B. Material number
C. Inspection lot number
D. Purchasing document number and item
E. Quantity and unit
正解:B,D,E
質問 7:
You have determined a new business inspection process and need to customize a new inspection type Which of the following activities must you complete? Correct 2
A. Assign inspection type to inspection lot origin
B. Define goods movement type
C. Assign Task list type to material types
D. Define default values for inspection type
正解:A,D