How do you map a counter replacement in SAP S/4HANA Asset Management?
A. Assign a catalogue type for counter replacement to the measuring point category.
B. Create a new measurement document and assign a valuation code for counter replacement.
C. Deactivate the current counter and create a new counter.
D. Create a new measurement document marked as a counter replacement.
正解:D
質問 2:
Which of the following parameters are available when you define a new maintenance plan category? Note: There are 3 correct answers to this question.
A. Call object
B. Completion data
C. Change documents
D. Maintenance activity type
E. Order type
正解:A,B,C
質問 3:
What is a characteristic of the SAP Fiori tile group? Note: There are 2 correct answers to this question?
A. It provides only HTML5-based apps
B. It is assigned via a portal role.
C. It is based on an SAP Fiori tile catalog.
D. It can be assigned directly to the user via personalization
正解:C,D
質問 4:
You want to implement SAPUI5 apps in your SAP Fiori Launchpad. Which are mandatory elements? Note. There are 2 correct answers to this question?
A. Tile Groups
B. Web Dynpro Apps
C. Transactions
D. Catalogs
正解:A,D
質問 5:
Which activities can the technician perform with the Report and Repair Malfunction SAPUI5 app? Note: There are 2 correct answers to this question
A. Schedule Dispatch
B. Complete Close Report
C. Release Start Work
D. Release Print
正解:B,C
質問 6:
What is characteristic for a maintenance order with status REL- if you also consider the capabilities of business functions? Note: There are 3 correct answers to this question.
A. The controller can determine actual cost surcharges.
B. The assignment of the notification to the maintenance order header cannot be deleted.
C. The planner can change estimated costs only at the header level
D. The planner can change planned costs at the operation level
E. Goods receipts for external services can be entered.
正解:A,D,E
質問 7:
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 2 correct answers to this question
A. Update the estimated costs
B. Change the settlement rule
C. Lock or unlock the order
D. Change the planned costs
正解:B,C
1227 お客様のコメント





二阶** -
C_P2W43_2023受験者必携の1冊ってじっかんしました。安心します。