Which of the following data can be tracked using a change-history-enabled key figure?Note: There are 3 correct answers to this question.
A. Modified date
B. Attributes
C. Scenario ID
D. Reason code
E. Key figure type
正解:A,B,D
質問 2:
Which constraints are taken into account by the Time-Series-Based Supply Planning Heuristic (Infinite)?Note: There are 3 correct answers to this question.
A. Transportation lead times
B. Minimum lot size
C. Maximum lot size
D. Aggregated constraints
E. Adjusted transport receipts
正解:A,C,E
質問 3:
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.
A. Change the description of the attributes in the time profile.
B. Change the numbering hierarchy of the period IDs in the time profile.
C. Change the past and future horizon of the levels in the time profile.
D. Add a new time profile level to the time profile.
正解:A,C
質問 4:
For which of the following application jobs can you enter planning filters as parameters?Note: There are 2 correct answers to this question.
A. Create Time Periods for Time Profiles
B. Purge Non-Conforming Data
C. Purge Master Data
D. Purge Key Figure Data
正解:C,D
質問 5:
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
A. Assign the compound master data type and its component master data types.
B. Configure at least one calculated key figure for the planning area.
C. Configure at most two input key figures on the same planning level in a key figure calculation.
D. Specify a planning horizon in the planning area for each level of the assigned time profile.
正解:A,D
質問 6:
You are configuring disaggregation for the KF1 key figure in the Planning Areas Model Configuration app.Which methods can you use?Note: There are 3 correct answers to this question.
A. Disaggregation according to a user-defined expression
B. Disaggregation in batch triggered by an application job
C. Disaggregation according to a helper key figure
D. Proportional disaggregation by using KF2 in the expression
E. Disaggregation according to an equal split
正解:A,D,E
質問 7:
Which of the following conditions are relevant for subtotals in the planning view?Note: There are 2 correct answers to this question.
A. The total value can be added before or after the selected attribute.
B. The total number of attributes that can use subtotals in the planning view can be restricted.
C. The values of the attribute-based total at the highest attribute level in the planning level can be changed.
D. Only attribute-based totals can be added to the planning view.
正解:A,B
質問 8:
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
A. Adjust for forecast bias in Forecast Error CV calculations
B. Adjust Safety Stock Recommendations based on forecast error CV input
C. Identifiy intermittent demand for Forecast Error CV calculations
D. Propagate forecast error to upstream locations in a supply chain network
正解:A,B
相沢** -
余裕でC_IBP_2208試験に受かりました!出題範囲をカバーした参考書でしゅ