An IBM xSeries server is being configured using the Custom configuration option of ServerGuide. A list of installation
tasks is displayed. What is the meaning of the exclamation point(1) that precedes some tasks?
A. This is a recommended task.
B. This task cannot be performed
C. This is a required task.
D. This task has been completed.
正解:C
質問 2:
Which two (2) of the following are tools included in IBM Director Extensions?
A. Resource Monitor
B. Management Processor Assistant
C. Capacity Manager
D. Remote Control
E. Process Manager
正解:B,C
質問 3:
In IBM xSeries servers, what feature identifies components that can be easily removed or manipulated while the
server remains powered on?
A. system information panel
B. an orange tab
C. light-path diagnostics
D. a blue tab
正解:B
質問 4:
Which of the following alert mechanisms is not supported by the ISMP in any configuration?
A. Generate SNMP traps
B. IBM Director via LAN
C. e-mail alerts
正解:C
質問 5:
The defined rules for transmitting data between two devices is called a _________
A. protocol
B. packet
C. interface
D. session
正解:A
質問 6:
Without any modifications, which three of the following are provided to a customer who purchases any model of the
IBM xSeries 205 uniprocessor server?
A. Automatic Server Restart (ASR) capabilities
B. Integrated system management processor
C. Integrated Ultra 320 SCSI controller
D. Integrated Gigabit Ethernet Controller
E. ServeGuide, and IBM Director
正解:A,D,E
質問 7:
In IBM xSeries servers with Enterprise X-architecture, functions including Active PCI-X and Remote I/O are enabled by
the __________
A. RXE expansion port
B. XA-32 / XA-64 core logic chip set
C. Operating system
D. I/O controller
正解:B
質問 8:
Chipkill memory provides what capability in IBM xSeries servers?
A. Improved performance over standard ECC memory
B. Hot-swap and hot-add capability
C. Memory mirroring
D. Multi-bit error detection and correction
正解:D
Watanabe -
Pass4Testお陰様でいい問題集を出会いました。感謝です。