How can a developer customize the reporting period so that the year has 52 weeks, with 7 days in
each week, yielding 364 days?
A. Set up a relative time category.
B. Set up a time period based on fiscal year.
C. Set up a lunar time period.
D. Set up a time period based on a calendar year.
正解:C
質問 2:
When running simultaneous cube builds, how can cube build times be decreased?
A. Use a single-CPU server model.
B. Use the same configuration files for each Transformer instance.
C. Assign each Transformer process one CPU.
D. Assign each Transformer instance one CPU.
正解:C
質問 3:
What can be created to determine the monthly growth showing the percentage of change between
Current Month and Last Month for all measures included in the PowerCube?
A. Alternate hierarchies
B. Calculated measure
C. Calculated categories
D. Calculated columns
正解:C
質問 4:
For performance reasons, what is the best parent-child ratio for categories in each level?
A. 10:1 or more
B. 1:11 or more
C. 1:10 or less
D. 5:1 or less
正解:C
質問 5:
The time dimension contains levels for year, quarter, and month. How can the month levels in
2008 be retained while removing them from 2007?
A. Create a scenario dimension.
B. Create a subdimension.
C. Add a special category.
D. Add a manual level.
正解:B
質問 6:
What can be done if a regular time dimension is added to a model, and the levels Year, Quarter,
and Month are not automatically generated?
A. Change the numeric time sequence for each level.
B. Set the date input format for the time dimension.
C. Set the data class of the source category to Date.
D. Create a non-standard time dimension with the new levels.
正解:C
星野** -
さっき受験スコアが届いてました。Pass4Testの問題集のおかげで高得点で受かりました。