A customer has an older series of Juniper routers installed at each of their branch offices.
Which resource would best assist in determining if the router can be monitored?
A. the Juniper product website
B. the warranty information for the routers
C. IEEE standards guidelines
D. SNMP command reference
正解:A
質問 2:
Understanding the type and number of current events being monitored in a customer's environment has the greatest impact on which solution?
A. IBM Tivoli Network Manager
B. IBM Tivoli Netcool Configuration Manager
C. IBM Tivoli Netcool Performance Manager for Wireless
D. IBM Tivoli Netcool/OMNIbus
正解:D
質問 3:
Which two factors are most important when evaluating a customer's existing workflow?
A. tool integration with trouble ticketing systems
B. number of product licenses required for their existing tools
C. number of network support employees
D. network support organization such as level one, level two. and so on
E. contact information for network support managers and decision makers
正解:C,D
質問 4:
A customer will deploy IBM Tivoli Network Manager (ITNM) and IBM Tivoli Netcool Configuration Manager (ITNCM). All resources within the topology database of ITNM need to be added to the ITNCM. This process should be as automated as possible.
What is the best approach?
A. Run the itnmGenerallTNCMSeed.pl script. This script will export the topology data of the NCIM database and import this data into the ITNCM database. No additional device synchronization is required after import.
B. Export a seed file out of the ITNM database and use the bulk import of ITNCM to import and discover the devices.
C. ITNM and ITNCM use the same database and are synchronized out-of-the-box.
D. Use the ITNM device driver available in ITNCM to import and automatically discover the devices.
正解:A
質問 5:
Which two Tivoli Common Repotting reports are available about IBM Tivoli Network Manager IP Edition?
A. IP Addressing Summary
B. ISDN Dialer Pool Details
C. Predictive Time-to-upgrade Summary
D. Time-in-motion Network Details
E. Discovery Drill-down
正解:A,E
質問 6:
If a customer utilizes outside consultants for staff support, when should these resources be included in the contact plan?
A. When their contracts are scheduled to last more than 6 months.
B. If they are more experienced than the customer's staff.
C. Never; outside consultants are competitors.
D. When their role or responsibility is relevant to the project.
正解:B