You have transferred an SAP ERP sales order to SAP TM. An order-based transportation requirement (OTR) was created which automatically created a freight unit.
You now create an SAP ERP outbound delivery for the sales order which is also automatically transferred to SAP TM to create a delivery-based transportation requirement (DTR).
How does this affect the associated documents in SAP TM? There are 2 correct answers to this question.
A. The freight unit is reassigned from the OTR to the DTR
B. The OTR is blocked for planning
C. The existing freight unit is canceled and a new freight unit is created
D. The OTR is consumed
正解:A,D
質問 2:
A large logistics service provider transports 20 packages in a full container load (FCL) consignment using its own vessel. The consignment is for 20 freight units (one transportation unit in total).
The main carriage is executed on a freight booking with nine other containers. The terminal in the port of destination only receives eight of the ten containers.
Which event handler types can you use to see if this FCL consignment was unloaded at the port of destination? There are 2 correct answers to this question.
A. Handling unit
B. Freight order
C. Freight unit
D. Transportation unit
正解:C,D
質問 3:
To which of the following can you assign a dimensional weight profile?
A. Charge profile
B. Calculation profile
C. Charge type
D. Calculation base
正解:B
質問 4:
Over fifty predefined condition types are used in the following:
There are 3 correct answers to this question.
A. Organizational unit determination
B. Incompatibilities
C. Document type determination
D. destination locations are stored on item level.
正解:A,B,C
質問 5:
You want to set up charge calculation for freight orders. Valid charges should consist of a based on the distance and gross weight of the freight order, and a supplemental charge per container that is included in the freight order. Multiple containers are allowed for each freight order, and the charge is based on the container type can be small, medium or large. What is the minimum number of charge lines with instruction type "standard" that you must set up?
A. 4
B. 5
C. 3
D. 2
正解:D
質問 6:
You have flagged "GIS quality" for your means of transport, LORRY, to calculate distances and durations accurately based on GIS (geographical-information-system). In which of the following apps/customizing tasks can you define durations that impact the scheduling of a freight order using means of transport LORRY?
Note: There are 2 correct answers to this question.
A. Define scheduling settings
B. Define transportation lane
C. Edit schedule
D. Maintain scheduling constraints
正解:A,B
Ootsuka -