SAP IBP ensures interoperability with which applications?Note: There are 2 correct answers to this question.
A. Business Network in SAP Ariba
B. User management in SAP Success Factors
C. Financial Planning in SAP Analytics Cloud
D. Salesforce Sales Cloud
正解:A,C
質問 2:
You are evaluating criteria for choosing the solver to support planning for a complex supply chain. What are some of the points that should be reviewed?Note: There are 2 correct answers to this question.
A. Push and Pull production models are used by the optimizer.
B. Planning results can be generated faster by the optimizer.
C. Finite heuristics can achieve demand prioritization and pegging.
D. Prioritization of demand elements one by one is achieved by unconstrained heuristics.
正解:A,C
質問 3:
You created a key figure and want to add calculations.Which of the following rules do you consider?Note: There are 2 correct answers to this question.
A. All key figure calculations have calculation inputs, which can be marked as stored or calculated.
B. Key figures can be calculated across different planning levels.
C. Aggregation calculations using SUM or MAX functions must be based on a higher aggregation level.
D. The calculation chain for a key figure must always result in a calculated key figure.
正解:A,B
質問 4:
You need to make manual adjustments to your S&OP plan.Which are possible ways of making these changes?Note: There are 2 correct answers to this question.
A. Leveraging the web-based planning capability
B. Leveraging the functionality of SAP Workzone
C. Using Driver-Based planning
D. Using Microsoft Excel planning views
正解:A,D
質問 5:
Which of the following data inputs, when increased, will always cause an increase in the safety stock outputs when the Global (multi-stage) Inventory Optimization operator is run?Note: There are 2 correct answers to this question.
A. Transportation Lead Time Error CV
B. Target Service Level
C. Holding Cost Percentage
D. Minimum Lot Size
正解:B,D
質問 6:
Which applications are present in the sample model SAPIBP1?Note: There are 3 correct answers to this question.
A. Response Planning
B. Demand Driven Replenishment
C. Demand Sensing
D. Inventory Optimization
E. Sales and Operations Planning
正解:C,D,E
質問 7:
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.
A. The key figure is stored and all editable.
B. The key figure is stored and system editable.
C. The key figure is calculated and all editable.
D. The key figure is calculated and system editable.
正解:A
石井** -
すべての問題を暗記して言ったら絶対合格すると思うよ。だって試験問題のほとんどがこの問題集に収めたんだもん。