A BIM manager is creating a firm-wide template for mobilization plans to outline the key steps, resources, and strategies required to set up and launch BIM operations at the beginning of projects.
Which two components should the template include to accomplish the goal? (Select two.)
A. Roles and responsibilities.
B. Project milestone dates.
C. Specifications.
D. Common Data Environment.
E. Contract template.
正解:A,D
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
The BIM manager on a large mixed-use development is leading the development of the project's information-delivery strategy. The client has strict handover requirements for both asset data and spatial coordination. The design schedule includes overlapping packages, and some task teams are unfamiliar with structured data exchanges.
What is the most appropriate approach to establish the project's information-delivery plans?
A. Rely on each task team to define its own data requirements and delivery formats, then consolidate them into a mixed-use matrix mid-project.
B. Develop a task and information-delivery plan to coordinate when, how, and by whom specific project information will be delivered.
C. Assign each discipline a default set of file-naming conventions and assume its internal processes will align with delivery needs.
D. Focus first on model-coordination planning, then address information delivery later in the construction phase.
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
The BIM manager is conducting a health check of a design model submitted by a consultant to assess its readiness for coordination. Several model performance concerns have been raised, including long open times, sluggish navigation, and excessive file size.
Which of the following actions would best help to evaluate the model's health and identify areas of improvement?
A. Notify the consultant to reduce the model file size by deleting sheets and exporting only 3D views.
B. Run a performance audit using review tools and evaluate the number of warnings, file size, and modeling practices such as in-place families.
C. Review the consultant's coordination clash reports to determine if unresolved issues are impacting performance.
D. Disable all linked files and re-enable them one at a time to identify which one is causing performance issues.
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
A contractor has requested the Architectural Revit model for a design-bid-build project to help with their fabrication drawings. The contractor understands and agrees that construction documents will govern in case of discrepancies.
How should the BIM Manager proceed?
A. Export the sheets to DWG format and send those files.
B. Add the contractor to the Autodesk Forma project for model access given their understanding.
C. Copy the model file and send it as soon as possible.
D. Verify that the contractor has signed a digital content release form before sending the model.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
A client's project schedule requires a rigorous milestone/gateway review process, defined in the BIM Execution Plan. The design firm has its own internal checklist.
What should a BIM manager do to ensure the team is complying with the client's requirements?
A. Import the client requirements as a PDF on the Revit opening view.
B. Remap the phase of the model to match the client phase most aligned to Design Development.
C. Add the client as a member on Autodesk Forma and allow them access to the published model.
D. Review BEP requirements against the checklist and create Issues in Autodesk Forma for non-standard requirements.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
Which of the following would typically be included in an AECO BIM data handover package at project closeout?
A. Internal meeting notes from model coordination sessions.
B. 3D views used for clash detection during model coordination.
C. Record models with the required asset data embedded.
D. Federated design models used during clash detection.
正解:C