An architect is designing the datastore configuration of a new vSphere-based solution.
The following information was obtained during the initial meeting with the customer:
There is currently 500 production and DMZ virtual machine workloads spread evenly across the primary and secondary site.
The profile of the workloads (per site) is as follows:
- DMZ:
-- 75 x Small: 1 vCPU, 2GB RAM, 200 GB disk
- Production:
-- 50 x Small: 1 vCPU, 2 GB RAM, 200 GB disk
-- 100 x Medium: 2 vCPU, 4 GB RAM, 200 GB disk
-- 25 x Large: 4 vCPU, 8 GB RAM, 500 GB disk
The average IO Profile per workload is 70/30 read/write.
The solution should cater to 10% storage growth in the first year.
The solution should cater to 15% virtual machine snapshot overhead.
The storage team has confirmed:
- A scalable external storage array has been deployed per site to support the storage requirements.
- The storage array will connect to all hosts using a dedicated Fibre Channel storage area network fabric.
- Usable storage capacity is available in 10 TB LUNs.
- As many LUNs as required can be provided.
- Every effort should be made to ensure the number of required LUNs is minimized.
The security team has stated that all DMZ and production workloads must remain logically isolated from each other.
Given the information provided, which three design decisions should the architect make to meet the requirements? (Choose three.)
A. Each 10TB LUN will be configured as a VMFS datastore.
B. Four 10TB VMFS datastores will be configured on each site for all production workloads.
C. Six 10TB VMFS datastores will be configured on each site for all production workloads.
D. Each 10TB LUN will be configured as an NFS datastore.
E. Seven 10TB VMFS datastores will be configured on each site for all workloads.
F. Two 10TB VMFS datastores will be configured on each site for all DMZ workloads.
正解:A,C,F
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
An architect is designing a new vSphere architecture and notes the following information during the design workshops:
vSphere distributed switches (VDS) will be used for all vSphere clusters. Switch naming will be based on cluster name, resource type function and switch number.
Port group naming will be based on function, role and VLAN number range.
Each host has two physical network cards each with two NIC ports:
- Card A aligns to vmnic0 and vmnic1
- Card B aligns to vmnic2 and vmnic3
The architecture must provide resilient network connections.
Management Services will use VLAN ID 43.
Virtual machines access VLAN ID 100.
The vSphere infrastructure will use a hyper-converged storage architecture.
How should the architect document the VDS physical design based on the noted information?
A. vSwitch Prod_DVS_01 will have 4 uplinks Port group name "pg_mgmt_43"- uplink = vmnic0, vmnic1- teaming policy = active/passivePort group name "pg_VM_100"- uplink = vmnic2, vmnic3- teaming policy = active/passive
B. vSwitch Prod_DVS_01 will have 2 uplinksPort group name "pg_mgmt_43"- uplink = vmnic0- teaming policy = active/passivePort group name "pg_VM_100"- uplink = vmnic1- teaming policy = active
/passive
C. vSwitch Prod_DVS_01 will have 4 uplinksPort group name "pg_mgmt_43"- uplink = vmnic0, vmnic2- teaming policy = active/passivePort group name "pg_VM_100"- uplink = vmnic1, vmnic3- teaming policy = active/passive
D. vSwitch Prod_DVS_01 will have 4 uplinksPort group name "pg_mgmt"- uplink = vmnic0, vmnic2- teaming policy = active/passivePort group name "pg_VM"- uplink = vmnic1, vmnic3- teaming policy = active/passive
正解:C
質問 3:
Which four factors should an architect consider when calculating the number of hosts required for a new multi-site vSphere-based solution that utilizes external storage? (Choose four.)
A. The workload profile (CPU and memory) of each workload
B. The number of existinq workloads that will be miqrated onto the new solution
C. The amount of resources required for virtual machine (VM) swap and VM snapshots
D. The future physical location of any workloads
E. The hardware specification of the underlying infrastructure
F. The number of existinq workloads that will be decommissioned prior to the completion of project
G. The number of network connections per physical host server
正解:A,B,D,F
質問 4:
An architect is working on a new VMware vSphere design and notes the following information during interviews with stakeholders:
The company has previously worked with multiple VMware partners
The company has an internal security policy that is referenced in long running contracts The company has an Enterprise License Agreement (ELA) with VMware The company has a multi-year cloud subscription agreement Which of these is a business factor that will impact this design?
A. The company has an internal security policy that is referenced in long running contracts.
B. The company has a multi-year cloud subscription agreement.
C. The company has an Enterprise License Agreement (ELA) with VMware.
D. The company has previously worked with multiple VMware partners.
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
An architect is designing a vSphere-based private cloud solution to support the following customer requirements:
The solution should support running 5,000 concurrent production compute workloads across the primary and secondary sites.
The solution should support running 1,000 development compute workloads within the secondary site.
The solution should support up to 50 management workloads across the primary and secondary site.
The solution must ensure the isolation of virtual infrastructure management operations between management and compute workloads.
The solution must ensure that hosting of any virtual infrastructure management workloads does not impact the amount of capacity available for compute workloads.
The solution must ensure that all production compute workloads are physically isolated from development compute workloads.
The solution must ensure that the operational management of compute workloads in the secondary site is possible in the event of a disaster affecting the primary site.
A combination of which four design decisions should the architect make to support the requirements?
(Choose four.)
A. The solution will deploy a VMware vCenter instance in the secondary site management domain for the virtual infrastructure management of production compute workloads.
B. The solution will deploy a VMware vCenter instance in each management domain for the virtual infrastructure management of management workloads.
C. The solution will deploy a separate management domain within each site for hosting local management workloads only.
D. The solution will deploy a VMware vCenter instance in the primary site management domain for virtual infrastructure management of production and development compute workloads.
E. The solution will deploy a VMware vCenter instance within the primary site management domain for hosting all management virtual machines.
F. The solution will deploy a VMware vCenter instance in the secondary site management domain for the virtual infrastructure management of production and development compute workloads.
G. The solution will deploy a VMware vCenter instance in the primary site management domain for the virtual infrastructure management of production compute workloads.
正解:A,B,C,G