Which step types can be used as the first step in an integration process?
A. Wait
B. Block
C. Send
D. Receive
正解:D
質問 2:
Messages of which quality of service can be executed in parallel queues on the Integration Engine?
A. Exactly Once (EO)
B. First In First Out (FIFO)
C. Exactly Once In Order (EOIO)
D. Best Effort (BE)
正解:A
質問 3:
What is the correct cardinality when using multi-mapping (target message structure >1) in an integration scenario without ccBPM?
A. 1:n
B. n:m
C. 1:1
D. n:1
正解:A
質問 4:
Which statements describe asynchronous messages within an SAP NetWeaver Process Integration dual stack?(Choose two)
A. They are processed in a different pipeline from synchronous messages.
B. They are not persisted on the Integration Server unless logging is switched on.
C. They are queued for processing by the Integration Engine.
D. They cannot be cancelled.
E. They are persisted on the Integration Server and can be re-sent from this location in case of problems.
正解:C,E
質問 5:
Which conversion parameters are available in the SOAP adapter?(Choose two)
A. Sync/Async Bridge
B. Do Not Use SOAP Envelope
C. File Content Conversion
D. Keep Headers
正解:B,D
質問 6:
You want to use standard functions in your message mapping. In addition to "true", which value is interpreted as true by standard functions that require Boolean input?(Choose two)
A. "TRUE"
B. "X"
C. "1"
D. No other value
正解:A,C
質問 7:
You want to build an integration process using a container operation.
Which operations can you use in the properties of the container operation?(Choose two)
A. Delete
B. Copy
C. Concatenate
D. Assign
E. Append
正解:D,E
質問 8:
Which of the following pipeline steps is optional for pipeline execution on the Integration Server?
A. Interface Determination
B. Receiver Determination
C. XML Validation Inbound Channel Request
D. Message split according to receiver list
正解:C
1226 お客様のコメント
クリック」





Kamijima -
試験合格しました。C_TBIT44_731の問題集をきちんと熟読すれば問題ないと思います。
お勧めしますよ。