Which allocation method should be used to allocate utility costs (heating, lighting, water etc.) to receiving cost centers whilst retaining the original nature of the cost?
A. Distribution
B. Periodic allocation
C. Assessment
D. Settlement
正解:A
質問 2:
A customer wants to create their profit and loss statement according to the cost of sales principle.
What master data supports this requirement?
A. General ledger account
B. Segment
C. Profit centre
D. Cost centre
正解:D
質問 3:
Cost centers are updated with expenses posted in the general ledger on a real time basis.
Which master data enables this update?
A. Primary cost elements
B. Balance sheet accounts
C. Profit and loss accounts
D. Vendor master data
正解:A
質問 4:
What are the mandatory steps to prepare the system for the activation of a selected SAP Best Practices package? (Choose three)
A. Check whether the support package level is suitable for the activation.
B. Check the documentation to define the sequence in which the scenario blocks have to be activated.
C. Install the Solution Configurator to accelerate the activation.
D. Import the relevant XML scope file into the Solution Builder to activate the solution.
E. Refer to the Quick Guide.
正解:A,D,E
質問 5:
What information is available for credit controllers if SAP dunning is set up and run periodically?
A. Last dunning level on customer master record only
B. Last dunning level from periodic dunning report only
C. Last dunning level on individual invoice(s) only
D. Last dunning level on customer master record and individual invoice(s)
正解:D
質問 6:
What steps are required to successfully activate an SAP Best Practices package? (Choose three)
A. Upload the corresponding txt.files for the personalization of the sample data.
B. Upload the solution file (scope file in XML format) into the Solution Builder.
C. Activate the Best Practices industry switch.
D. Perform the proposed manual activity when the Solution Builder stops during the activation.
E. Accept the predefined scope, and activate and delete the unwanted Customizing data afterwards.
正解:A,B,D
質問 7:
You have finished the integration test and are about to migrate to the production environment.
One of the tasks of the cutover process is to transfer the Customizing from the development environment to the production environment using transport requests.
What will be transferred to the production environment via transport requests?
A. Company codes, controlling areas, plants, charts of accounts, cost centers, and internal orders
B. Company codes, controlling areas, plants, charts of accounts, and internal orders
C. Company codes, controlling areas, plants, charts of accounts, and cost centers
D. Company codes, controlling areas, plants, and charts of accounts
正解:D
987 お客様のコメント
クリック」





Saeki -
とても読みやすいC_A1FIN_10参考書で丁寧な解説ですね。