A customer is ordering a PowerLinux 7R2 and requires virtualization capabilities. Which of the following supports the customer requirement?
A. SuSe with KVM
B. SuSewithXEN
C. SuSe with VMControl
D. SuSe with PowerVM
正解:D
質問 2:
What is an advantage of running virtualized Linux partitions on a PowerLinux server compared to virtualized images on an x86 system?
A. All necessary Linux virtualization software is included with PowerLinux servers at a low price point.
B. PowerLinux server hardwarenatively supports virtualization anddoes not require a virtualization layer for micropartitions
C. The POWER Hypervisor is not required when running Linux only partitions and can be disabled to significantly improve performance.
D. PowerLinux servers offer customers a choice of using PowerVM or KVM to manage virtualized Linux environments.
正解:A
質問 3:
An existing customer with a POWER5 server would like to compare the performance differences for a new Power Systems server. Which resource provides the information in the most concise format?
A. Power Systems Performance Report
B. Competitive Performance Analysis
C. Commercial Processing Workload
D. PM for Power Systems
正解:A
質問 4:
A hospital has several Power 750 servers, each using PowerVM Standard Edition with VIO Server (VIOS) connected to a SAN.
The customer plans to add a Power 770 and wants to use Live Partition Mobility (LPM) to move common workloads from some of the Power 750 systems to the Power 770.
What should be proposed to support the customer requirement?
A. PowerVM Standard Edition on the Power 770
Systems Director LPM Agents for each server using VIOS.
B. VMControl Enterprise Edition on the Power 770
PowerVM Enterprise Edition for each server running VIOS
C. Partition Load Manager on the Power 770
One licence of Partition Load Manager for each Power 750.
D. PowerVM Enterprise Edition on the Power 770
PowerVM Enterprise Edition upgrades on the Power 750 systems
正解:D
質問 5:
A customer states that Power Systems servers are too expensive to purchase when compared to other servers. What is an appropriate response?
A. The added value of a 3 year hardware warranty offsets the higher acquisition cost when compared to x86 systems.
B. The high cost of Power Systems is offset by their reliability.
C. The true measure of system cost is TCO and not acquisition price.
D. Power Systems servers offer twice the performance of x86 systems for the same acquisition cost.
正解:C
質問 6:
A customer who ordered Red Hat Linuxfrom IBM needs to renew their subscription to the distribution. How should this be done?
A. Renewal subscriptions must be ordered directly from Red Hat.
B. If SWMA is in effect, the subscription is automatically extended.
C. Subscriptions are automatically renewed unless the customer specifies otherwise.
D. If SWMA is not in effect, and After License Charge (ALC) will be required before the subscription can be renewed.
正解:A
質問 7:
Which of the following are customer support options for the SuSe or Red Hat Linux distributions for Power Systems servers?
A. Red Hat and SuSe support OS Support Services
B. IGS Support Services Community support
C. Red Hat and SuSe support Community support
D. IBM PowerLinux SWMA IGS Support Services
正解:A
質問 8:
A prospective client is planning a server consolidation project which relies heavily on virtualization technologies. The client showed some SPEC benchmark numbers that made POWER7 and Xeon performance appear to be equivalent.
Which response articulates the advantage of Power Systems when used in benchmarks?
A. Benchmarks run on x86 architecture servers use different rules and generally show better results over POWER7 systems.
B. Benchmarks on x86 systems exclude VMware overhead but the POWER Hypervisor is always included.
C. Benchmarks do not utilize SMT and will show less positive results than can actually be obtained.
D. Benchmarks for POWER7 do not recognize that execution speeds will increase as performance improves over time.
正解:B