A company is moving is 1, 500 employees into a new office building, which has lust passed documentation review. The building contractor has handed over the project. And the certificate of occupancy was granted two months ago Currently, 650 employees occupy the building. Which of the following steps should the WELL AP advise the project team to take next?
A. Perform a post occupancy survey
B. Conduct an internal performance verification
C. Wait until 50% occupancy for performance verification
D. Proceed with performance verification at 45% occupancy
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
At what stage are documents created that represent policies and operations schedules that are planned to be implemented?
A. Intent
B. Implementation
C. Performance verification
D. Schedule review
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
A project satisfies requirements lot Feature V10: Self-Monitoring Part 1 if it provides eligible employees with self-monitoring tools mat are subsidized by at least
A. 50%
B. 10%
C. 33%
D. 29%
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
During a project review meeting, a member of the facility management team states that asbestos containing materials (ACMs) may be present within the project boundary. What strategy should the project team follow to evaluate this issue?
A. Create an asbestos action plan to remediate the ACMs and schedule ongoing inspections
B. Notify any building occupants about the risk of ACMs
C. Obtain a letter from the building owner affirming there are no known ACMs in the project boundary
D. Hire a qualified inspector to investigate the project boundary and space to determine whether ACMs are present
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
To reduce sound transmission between adjacent spaces, construction plans should specify
A. alignment of all gypsum board seams
B. wall construction with noise isolation class (NIC) of 35 in all spaces
C. non-hollow core doors for private offices and conference rooms
D. interior partition walls with cutouts
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
Which of the following techniques is used to remove pollutants that were introduced indoors during construction prior to occupancy?
A. Using low-VOC paints
B. Protecting absorptive materials
C. Installing permanent walk-off mats
D. Performing an air flush
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
For an office project lo earn one point in Feature L03 Orcadian Lighting Design what level of equivalent melanopic lux (EMI) needs to be achieved at workstations in regularly occupied spaces and which piano should the light be achieved on?
A. At least 150 EML; measured on the horizontal plane
B. At least 100 EML; measured on the horizontal plane
C. At least 150 EML; measured on the vertical vertical
D. At least 100 EML; measured on the vertical plane
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
An open office has an overhead T8 Fluorescent lighting system. To comply with Feature L04 Electric Lighting Glare Control, what is the maximum luminance for light omitted more than 45 degrees from nadir and below the horizontal plane?
A. No limit for luminance at those angles
B. 600,000 cd/m2
C. 60,000 cd/m2
D. 6, 000 cd/m2
正解:D
解説: (Pass4Test メンバーにのみ表示されます)