Which of these are correct if Cpk Upper is 2.0 and Cpk Lower is 1.0?
A. The process is not stable.
B. Cpk must be reported as 1.0.
C. The process is shifted to the left.
D. The process Mean is 1.5.
正解:B
質問 2:
When looking at a distribution graph, the Mean is defined as the __________.
A. Total sample size
B. Aggression measured
C. Average based on the sample size
D. Measurement based off a quarter of the sample size
正解:C
質問 3:
In order to standardize project savings financial calculation such project benefits can be compared the financial savings are typically calculated over what period of time?
A. The remainder of the fiscal year
B. 24 months
C. 12 months
D. The remainder of the calendar year
正解:C
質問 4:
The Z score is a measure of the distance in Standard Deviations of a sample data point from the Median of the sample population.
A. False
B. True
正解:A
質問 5:
Lean removes many forms of ______________ so Six Sigma can focus on reducing _______________.
A. Waste, variability
B. Waste, cost
C. Inventory, defects
D. Movement, variation
正解:A
質問 6:
Which of these is Discrete data?
A. Race car consumed 23 gallons of fuel.
B. Of the 42 people on the bus, 12 went into the station.
C. It took 3 hours and 32 minutes to complete the marathon.
D. Train arrived at 4:17 pm.
正解:B
質問 7:
Training cost $6,500 and a project required an initial investment of $47,500. If the project yields monthly savings of $3,500 beginning after 4 months, what is the payback period in months, before money costs and taxes?
A. 23.7
B. 19.4
C. 9.7
D. 15.4
正解:B
Nagai -
内容はとても試験対策になっております。信頼に値するICGB問題集をかけて、簡単に勉強できる。本当に助かりました。