When creating a new job stream using the Dynamic Workload Console, what are the minimum requirements for a job stream to be selected for launch after FINAL job stream introduces a new Plan?
A. RunCycle and not inDraft mode
B. A scheduled time specified and not in Draft mode
C. RunCycle and at least one job
D. At least one job and not in Draft mode
正解:B
質問 2:
In a working production environment, a customer would like to change the start of day from 0600 t0000 and have the current plan span 0000-2359 each day.
After changing global option sd. which command fulfills this requirement?
A. JnextPlan
B. JnextPlan -foe 1800
C. JnextPlan -t0000
D. JnextPlan -for 0000
正解:D
質問 3:
Which conman command confirms if any event rules are deployed on theworkstation LINUX01?
A. showcpus LINUX01;link
B. sc LINUX01;info
C. showcpus LINUX01;keys
D. sc LINUX01;getmon
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
Courier.msg is growing and TWSMERGE log contains a very large number of Check n(On) entries. What can be done to reduce the numberof On entries?
A. Set wr check in localopts to a larger number.
B. Increase the size of the Courier.msg file using evto size.
C. Set bm check file in localopts to a larger number.
D. Set jm check in localopts to a lower number.
正解:A
質問 5:
Which log should be reviewed if a job running on a fault-tolerant agent (FTA) abends?
A. SystemOut.log
B. joblog
C. TWSMERGE on the master domainmanager
D. TWSMERGE on the FTA
正解:B
質問 6:
A workstation has a FENCE of 10, LIMIT of 5, and a job with a priority of 10 currently on HOLD. What must be changed to enable a job to launch?
A. Change the FENCE t9.
B. Change the workstation LIMIT t10.
C. Change the workstation LIMIT t0.
D. Change the job stream PRIORITY to GO.
正解:D