A customer plans to implement a web-based solution that requires 34 Power cores. They want to acquire a POWER8 solution with the best TCA.
Assuming all other configuration requirements are equal, which solution provides the best TCA?
A. TwoS824s
B. OneS822
C. OneE870
D. Three S814s
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
How does POWER8 technology contribute to lower TCO?
A. Higher performance cores reduces software licensing.
B. Software licensing and with Capacity on Demand allows software to be licensed to the lowest core count.
C. RAS features mean the cost of failover systems can be eliminated.
D. The lower energy usage of Power Systems can reduce 20% of systems costs.
正解:A
質問 3:
What is a performance monitoring product that is available on the E880?
A. PowerSC
B. PowerVP
C. PowerVM
D. PowerVC
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
A customer states that they requ.re N_ Port ID Virtualization (NPIV) for storage attachment. Which adapter will satisfy their requirement?
A. 12Gb Cache RAID SAS quad-port 6Gb adapter
B. 40GbE Infiniband adapter
C. 8Gb Fibre Channel adapter
D. 4Gb Fibre Channel adapter
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
A customer is implementing a new mission critical SAP landscape and requires a Power system with the highest level of RAS support.
Which of the following will satisfy the requirement?
A. Any POWER8 system
B. S824, E870, or E880
C. E880 only
D. E870 or E880
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
In a very competitive situation, a business partner requested the assistance of an IBM Field Technical Systems Specialist (FTSS) to help differentiate an E880 against HP. The team was successful and the client wants to acquire the proposed Power solution.
Who is required to perform the Technical Delivery Assessment (TDA) in this situation?
A. The IBM FTSS.
B. The FTSS with the Business Partner assistance.
C. The Business Partner with FTSS assistance, if requested.
D. Only the customer. A TDA is not required because the FTSS was involved.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 7:
A customer wants to run multiple workloads, and is considering an S824 or an E870.
Under which condition would the E870 be more appropriate?
A. If the customer needs to run AIX, IBM i, and Linux using internal disk.
B. If the customer expects to grow beyond 2TB of memory and more than 24 cores.
C. If the customer needs hot plug PCIe adapters.
D. If the customer needs to support more than 1TB of memory.
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
A customer with AIX and IBM i based applications is considering a move to open source Linux applications on x86 systems.
Which benefit should be highlighted for the customer to stay with the Power platform?
A. The customer can recompile the AIX and IBM i applications and continue with Linux on their existing Power System.
B. The Power system uses Lx86 allowing Linux to run unchanged on Power.
C. The Power Linux system is more powerful and will cost less than the x86 systems, thereby saving costs.
D. The Power system they are running on can support the existing applications and the new Linux applications at the same time.
正解:B
解説: (Pass4Test メンバーにのみ表示されます)