An IBM i customer has a POWER9 processor-based server set up with a single virtual machine with an HMC.
They need to test a new version of the existing application for two weeks, separate from the production environment. Disk capacity is currently 40%. CPU requirements are minimal.
Which is the least cost and effort option?
A. Create a virtual machine on the current server.
B. Rent a POWER9 processor-based server.
C. Rent a virtual machine in the Cloud.
D. Purchase new disk for an additional virtual machine.
正解:A
質問 2:
What is the minimum memory capacity of a Power System E980?
A. 32TB
B. 128TB
C. 64TB
D. 192TB
正解:C
質問 3:
A customer's infrastructure is currently based on a Power System E870 managed by an HMC 7042-CR6 at V8.860 SW level. They are planning to upgrade their server to a new Power System E980.
Which of the following will enable the customer to connect an HMC to the Power System E980?
A. Use the existing HMC at the current SW level.
B. Install vHMC on a partition on the Power System E980.
C. Order a new Power-based HMC (7063-CR1).
D. Upgrade the software on the existing HMC.
正解:D
質問 4:
Which of the following is a benefit of the POWER9 processor with Power Enterprise Servers when compared to x86?
A. More threads per core
B. DDR4 Memory
C. NVIDIA Tesla V100
D. More cores per socket
正解:D
質問 5:
Which of the following adapters is used to attach a FlashSystem 900 to a Power System E980?
A. A 16Gb Fibre Channel adapter.
B. A 12GB write cache SAS adapter.
C. An optical CXP converter adapter.
D. An EDR InfiniBand adapter.
正解:A
質問 6:
What is a characteristic of POWER9 processor-based virtualized environments?
A. Greater virtualization increases the cost of computing.
B. Processors are assigned per whole core.
C. Greater virtualization reduces workload costs.
D. Resources must be dedicated at the PCIe card level.
正解:C
質問 7:
What POWER9 processor capability has been enhanced, relative to POWER8, to enable more efficient processor utilization in support of some applications?
A. SMT8 Fused Core Optimization
B. Direct Attached Memory Mode
C. AltiVec Instruction set
D. SMT16 Simulation Mode
正解:C