Which are levels of internal order planning? There are TWO correctanswers for this question
A. Overall planning
B. Integrated planning
C. Primary and secondary cost and revenue planning
D. Group costing
正解:A,B
質問 2:
You want to determine which operations of the oruting should be considered in a product cost calculation.
How do you do this ? 2 Answers
A. By marking the cost indicator in the control key assigned to the operation
B. By assigning a cost center top the work center in the operation
C. By marking the Relevance to Costing indicator in the operation
D. By defining a usage key in the header of the routing
正解:A,C
質問 3:
You post an expense line in an accounting document and enter an internal order and a cost center as the account assignments. After posting, the system allows you to settle the posted values from the internal order.
Which settings do the cost center and internal order have?
A. Statistical internal order
Real cost center
B. Real internal order
Statistical cost center
C. Real internal order
Real cost center
D. Statistical internal order
Statistical cost center
正解:C
質問 4:
You want to configure different cost centers in your company. Which setting in the cost center master data wi you use to assign the same attributes to similar cost centers?
A. Cost center type
B. Activity type
C. Functional area
D. Cost center category
正解:D
質問 5:
Howdoes SAP S/4HANA capture costs?
A. All primary and secondary costs are captured bycreating them as cost elements.
B. Secondary costs are captured as secondary cost elements, and NOT as general ledger accounts.
C. Primary and secondary costs are captured in general ledger accounts
D. Only primary costs are captured in general ledger accounts
正解:A,C
質問 6:
When trying to assign a profit center to a new cost center, you receive an error. What can cause thiserror?
A. The lock indicator is activated in the profit center master record
B. The profit center has already been assigned to a different cost center
C. The validity period of the profit center is shorter than that of the cost center
D. The validity period of the cost center is shorter than that of the profit center
正解:A
質問 7:
Which processes belong to the "finalcosting" of cost objects? There are TWO correct answers for this question
A. Work in process
B. Overhead surcharge
C. Revaluation at actual costs
D. Variance calculation
正解:A,D
林*唯 -
C_TS4CO_1909試験は暗記が勝負のところがあるので、そこは少し手間かもしれません。