The scope item Solution Order (4GT) has been activated in your SAP S/4HANA Cloud system. You add a product you are selling to your customer to a solution order.
Which of the following features are available?
Note: There are 2 correct answers to this question.
A. An option called Check Sales Items is available to retrieve availability data for the sold product.
B. An option called Check Sales Items is available to check whether all required fields needed for follow-up processing have been specified in the solution order item.
C. Since no sales order is created, an outbound delivery can be created directly for the solution order item.
D. Order type and item type/category determination for a sales order that is to be created, is performed in the solution order.
正解:A,C
質問 2:
How can you migrate data to SAP S/4HANA Cloud?
Note: There are 2 correct answers to this question.
A. RFC calls
B. Staging database
C. Core Data Services
D. File templates
正解:B,D
質問 3:
When defining service contract scenarios that require flexible pricing by using the item category SCN2 (price adoption item category), what methods for price adaptation are available?
Note: There are 2 correct answers to this question.
A. Set the billing and settlement dates within a billing request line as the pricing date of a service contract item, so that varying prices can be determined on varying dates
B. Maintain the prices of service contract items manually at service contract item level
C. Maintain the prices of service contract items manually at billing request line level
D. Use pricing condition records with varying validity periods and maintain pricing elements in these condition records per validity period
正解:A,C
質問 4:
Which activities does the consultant do before the first Fit-to-Standard workshop?
Note: There are 2 correct answers to this question.
A. Review the integration requirements collected from the Digital Discovery Assessment.
B. Evaluate the Business-Driven Configuration Questionnaire responses.
C. Upload customer master data in the Starter system using migration templates.
D. Deactivate scope items that are NOT part of the Statement of Work/Digital Discovery Assessment.
正解:A,B
質問 5:
What is the key characteristic of the process for a service quotation where the service quotation type Standard Service Quotation is used?
A. The total capacity requirements are calculated based on the time and material information entered in the quotation.
B. The total quotation amount is calculated based on the time and material information entered in the quotation.
C. The total quotation amount is calculated based on the fixed price that is entered in the quotation.
D. The total available to promise (ATP) quantity is calculated based on the quantities entered for all quotation items.
正解:B
質問 6:
Why do you configure output control for service quotations?
A. You need to define the possible follow-up steps after service quotation confirmation.
B. You need to define the prerequisites for service quotation confirmation by the customer.
C. You need to define in which form a service quotation needs to be sent to a customer.
D. You need to define the dependencies between statuses a service quotation can have.
正解:C