You are responsible for designing a disaster recovery plan for your organization's Business Objects Enterprise system. You must ensure that in the event of a major catastrophe, the Business Objects Enterprise system will always operate at its intended capacity with minimal human input. Which three design goals should you include in your disaster recovery plan? (Choose three.)
A. Fault tolerant servers should be up at all times.
B. Backup systems must be an exact mirror of the production system.
C. Locate the backup system close to the production system.
D. Fault tolerant servers should be brought up only in the event of a disaster.
E. Include additional license fees into the estimated project cost.
正解:A,B,E
質問 2:
Which two options are properties of the List of Values (LOV) Server? (Choose two.)
A. Minutes before an Idle Connection is Closed
B. Maximum Simultaneous Processing Threads
C. Maximum Jobs Allowed
D. Temp Directory
正解:C,D
質問 3:
Once you grant the right to an application value (e.g. Print Documents set to Grant) to a user/group on a specific application (e.g. Desktop Intelligence), you will still be able to grant that right (e.g. print) to one Desktop Intelligence document but not the other Desktop Intelligence document.
A. False
B. True
正解:A
質問 4:
When viewing successful Crystal Reports instances, which server is it most beneficial for the Crystal Reports Page Server machine to be close to?
A. Input File Repository Server
B. Output File Repository Server
C. Production Database Server
D. Crystal Reports Cache Server
正解:B
質問 5:
What are three design goals of a Business Objects Enterprise backup system that must remain available during a major disaster? (Choose three.)
A. The two systems must be running at all times to ensure that they are synchronized.
B. The backup system must be an exact duplicate of the primary system.
C. An automated process must be in place to notify administrators when the primary system fails.
D. The backup system should be located far enough away from the primary system that it will not be affected by the disaster.
正解:B,C,D
質問 6:
A BusinessObjects Enterprise user with the appropriate rights asks to view a Web Intelligence document on demand. When the Web Intelligence Report Server has finished processing the report, it sends the report to which of the following BusinessObjects Enterprise servers?
A. Output File Repository Server (FRS)
B. Crystal Reports Cache Server
C. The Web Application Server (WAS)
D. Web Intelligence Job Server
正解:C
907 お客様のコメント





Tsuchiya -
昨年度、問題で10点足りず不合格となってしまいました。
Pass4TestのC_BOE_30問題集を使って勉強し、合格することができました。
解説が充実しており、とてもわかりやすかったです。