A Power 720 customer running IBM i recently failed an internal security is audit. The customer asked for a solution that will enable them to better track who accesses, or attempts to access, certain confidential files.
Which of the following recommendations is most appropriate?
A. IBM i can provide tracking for all users, activity tracking for specific objects, and for specific users.
B. IBM i continuously logs information of all system security activities in time-stamped history logs.
C. Tivoli Security Management suite for IBM i provides a centralized security management and access control tool set.
D. IBM has earned ISO 27001 Certification and now has controls to safeguard consumer data in both public and private clouds.
正解:A
質問 2:
An 8-core POWER7+ server with IBM i 7.1 runs two distinct interactive applications. The applications need to be separated so that one user group has twice as much memory as the other.
What is the minimum required to make this change?
A. Add PowerVM Standard so that an LPAR can be created for each application
B. Add a new IBM i subsystem definition to separate the users into memory pools
C. Add an IBM i Navigator pre-start job for each user group to allocate memory
D. Add PowerVM Express so that an LPAR can be created for each application.
正解:B
質問 3:
An 010 plans to purchase a new Power System. In a previous purchase of non IBM servers, critical components were missing from the proposal. As a result, additional items had to be purchased. Which IBM tool will help ensure that the proposed system contains the necessary components?
A. Workload Estimator
B. eConfigurator
C. System Planning Tool
D. Server Validation Tool
正解:B
質問 4:
A customer has a Power 740 with 128GB of memory installed. There are 6 LPARs with dedicated memory implemented. Performance analysis shows that the usage of the memory in the different LPARs changes frequently and is rarely optimal.
How can memory optimization be achieved?
A. Active Memory Sharing
B. Utility CoD Memory
C. Shared Memory Pools
D. Active Memory Expansion
正解:A
質問 5:
An existing IBM i customer with a POWER6 520 is planning to move to POWER7I but wants to understand the differences between running IBM i on a PureElex compute node compared to a new POWEP7 720 server.
Which of the following describes a key consideration for this customer related to running IBM i on a PureFlex compute node?
A. Punning IBM i on a PureFlex compute node requires VIO Server to provide all virtualized I/O resources.
B. IBM i on a PureFlex compute node requires dedicated physical adapters for all I/O resources.
C. The integrated storage node is a requirement for storage for a compute node running IBM i.
D. Systems Director VMControl management software is required for compute node management.
正解:A
質問 6:
Which of the following best describes a unique characteristic of IBM i when compared to non-IBM platforms?
A. IBM i provides Processor Instruction Retry and Alternate Processor Recovery mechanisms to recover from processor errors by utilizing an available spare processor core.
B. IBM i comes with a performance tuner that provides network multi-pathing, based on predictive analysis, to utilize all Ethernet ports.
C. Integration with BladeCenter and System x allows IBM i partitions to host heterogeneous applications running Microsoft Windows or Linux applications.
D. DB2 doesn't require any specific database installation procedures, and provides automatic storage allocation for all database objects.
正解:D
質問 7:
Regarding IBM i licensing options for the Power 720 server which of the following statements is true?
A. An IBM i license is required for every 25 concurrent application users.
B. A processor entitlement is required for each core running IBM i, and a user entitlement is required for each concurrent user.
C. A base number of user entitlements are included, and additional user entitlements may be purchased in blocks of 25.
D. A processor entitlement is required for each core running IBM i, and a database entitlement is required for each core running DB2.
正解:B
質問 8:
A Power 740 customer running IBM i recently installed a new query-based analytics tool. Since adding the tool, overall system performance has suffered due to dramatically increased disk I/O.
The customer has very limited room in their data center for additional disk drives and they have asked for a recommendation to address their needs.
What is the appropriate action for a sales representative to take?
A. Recommend the IBM Storwize V3700.
B. Instruct the customer to turn on the optional TurboCore mode.
C. Activate JobWatcher to optimize query activity.
D. Advise the customer to download the SSD Analyzer tool.
正解:D
Shigemori -
Pass4Testさんの押さえるべきポイントを確実に覚えればなかなかA4040-124試験でいい点は取れると思う。