An administrator wants to check the vSAN cluster health during the maintenance window while vCenter Server is offline.
What are two ways to complete this task? (Choose two.)
A. HCIBench
B. vSphere Host Client
C. esxcli
D. ESXi system logs on vSAN datastore
E. esxtop
正解:B,C
質問 2:
What should be used to verify object resynchronization progress and impact after a global policy change?
A. vCenter HTML5 client
B. vRealize Network Insight
C. vRealize Log Insight
D. HCI Bench
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
An administrator has discovered that space utilized by VMs does not decrease after deleting files and folders within the VMs. The administrator needs to be able to reclaim this space.
Which action could the administrator take to accomplish this task?
A. Enable TRIM/UN MAP for the vSAN cluster.
B. Reboot the VM to recreate the swap file.
C. Set the Object Space Reservation rule to 100%.
D. Disable Storage I/O Control for the vSAN cluster.
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
Which solution can automate the deployment of a vSAN cluster as part of a full Software-Defined Datacenter?
A. vRealize Suite Lifecycle Manager
B. vSphere Replication
C. VMware Cloud Director
D. VMware Cloud Foundation
正解:D
質問 5:
A business unit requires proprietary data to be protected against a site failure while using the least amount of storage and the least amount of nodes. AN administrator plans to implement a vSAN Stretched Cluster with a RAID-5 policy.
What is the minimum number of data nodes across all sites in this vSAN Stretched Cluster configuration?
A. 8
B. 4
C. 6
D. 12
正解:A
質問 6:
A vSAN administrator has three available racks and six vSAN hosts and needs to protect against a rack failure while maximizing resources.
Which two strategies should the vSAN administrator use to achieve this goal? (Choose two.)
A. 2-node configuration
B. Specify fault domains
C. RAID-6/FTT=2
D. RAID-5/FTT=1
E. vSAN stretched cluster
正解:B,C
質問 7:
A vSAN administrator has been tasked to add capacity to an existing vSAN cluster and has ordered enough larger capacity devices to complete this work. Tests have been executed, and the replacement from one single capacity device will require 70 minutes.
Which two approaches can the vSAN administrator use to complete this task? (Choose two.)
A. "Shutdown ESXi host", and replace all capacity devices. Repeat this sequence one-by-one.
B. Enter Maintenance Mode, confirm that pre check is fine, select "Full data migration", "Shutdown ESXi host", replace all capacity devices, "Restart ESXi host", replace capacity devices in disk groups, exit Maintenance Mode, confirm that raw capacity has been increased, and then repeat on ESXi host one-by-one.
C. "Change object repair timer to 75 minutes", "set capacity device to offline", and then replace capacity device one-by-one.
D. Confirm with pre-check that enough capacity for data migration is available, select a capacity device, click "remove disk" with "Ensure accessibility", replace capacity device, claim unused device, and then repeat one-by-one.
E. Execute a "Data Migration Pre-Check", enter Maintenance Mode with default setting, "Shutdown ESXi host", replace all capacity devices, and then repeat on ESXi hosts one-by-one.
正解:A,B
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
A remote location was configured with Cloud Native Storage. When the administrator put the host in maintenance mode to perform monthly patching, the File Server Health check was triggered.
Which action, if any, should the administrator take to resolve the issue?
A. Click the Repair Objects Immediately button in the VMware Skyline Health Checks.
B. Modify the repair delay timer to 75.
C. It will resolve after 60 seconds, so no action is necessary.
D. Remove the host from maintenance mode, and put it back with Full Data Migration.
正解:C