Not including TestManager or custom logging, how can you organize RFT test results?
A. define and follow a naming convention for all logs and log subfolders
B. create as many folders in the *_logs project as needed and drag logs into the appropriate folders
C. define and follow a naming convention for all test logs
D. create additional log projects which are associated with the primary RFT project, (for example,
正解:C
質問 2:
Which statement is true about the "Time Delayed" method when you are creating verification points in your scripts?
A. It gives the tester the opportunity to specify a delay after a verification point fails
B. It gives the tester time to reveal pop-up objects (such as menus) during the creation of a verification point
C. It introduces a fixed delay after a previous action before the verification point is tested
D. It allows a verification point to keep trying until the time specified has elapsed
正解:B
質問 3:
How do you add line numbers within the script editors view?
A. download the latest version of the plug-in
B. use a third party plug-in because this option is not available within the tools interface
C. select the option under the main menu > Window > Preferences > Editor
D. select the option under the main menu > Window > Preferences > Debug
正解:C
質問 4:
Out of the box, what are the different options for logging RFT tests?
A. HTML, text, TPTP,TestManager, and none
B. HTML, text, custom,TestManager, and none
C. HTML, PDF, text,TestManager, and none
D. TestManager, CQTM, TPTP, HTML, and none
正解:A
質問 5:
When you set break points, why does the script not stop at the break points and switch over to the debug perspective?
A. The debug perspective is not listed as an available perspective when trying to debug a script
B. This is a known eclipse bug in version 6.1 and has been corrected in the latest release or last interim fix
C. Either the icon or debug functional tester script was not invoked or the shift + F11 menu option was not invoked
D. The break point has already been recognized by the JVM and the break point needs to be toggled
正解:C
本多** -
本問題集学習し、C9510-842合格しました。Pass4Testの説明は遥かにわかりやすいのでよいです。