A virtual private cloud administrator is regularly tasked to provision and manage new application workloads with dedicated subnets.
Which two capabilities of VMware Cloud Foundation (VCF) can be used to alleviate the workload of the administrator with minimal interaction with the networking team? (Choose two.)
A. Configure vSAN storage policies for each application.
B. Use vSphere Resource Pools to allocate networking resources to different applications.
C. Deploy Aria Automation to enable self-service provisioning.
D. Use of NSX overlay networks.
正解:C,D
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
An administrator has been tasked with expanding an existing VMware Cloud Foundation environment by adding a new workload domain. The environment currently has one management domain and one VI workload domain.
What options are available to the administrator for deploying NSX in the second VI workload domain?
A. The new workload domain can have its own dedicated NSX Fabric or it can join the existing NSX Fabric configured in the management domain.
B. The new workload domain can have its own dedicated NSX Fabric or it can join the existing NSX Fabric configured in the existing VI domain.
C. The new workload domain can have a dedicated NSX Fabric or it can join the existing NSX Fabric configured in either the management domain or existing VI domain.
D. The new workload domain must have a dedicated NSX Fabric.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
An administrator needs to delete and re-deploy an NSX Edge cluster that was originally deployed from SDDC Manager and has downloaded the edge cleaner tool.
Where should the administrator run the tool to complete this task?
A. On the Edge cluster node VM(s).
B. On the NSX Manager VM.
C. On the Cloud Builder VM.
D. On the SDDC Manager VM.
正解:A
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
What is the recommended method for managing IP address allocation for VMware ESXi hosts in a VMware Cloud Foundation environment?
A. Dynamic IP addresses assigned via DHCP and without any reservations
B. Dynamic IP addresses assigned via DHCP with reservations
C. Static IP addresses assigned manually
D. Static IP address assigned using VMware NSX IP Pools
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
Which two operations can be completed in the SDDC Manager UI on an NSX Edge cluster after it has been deployed into a workload domain? (Choose two.)
A. Expand
B. Shrink
C. Delete
D. Sync
E. Redeploy
正解:A,B
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
DRAG DROP
Match each networking issue with the corresponding troubleshooting step.

正解:

質問 7:
A newly added ESXi host is not able to communicate with the vCenter Server.
What three steps should an administrator take to diagnose and resolve this issue? (Choose three.)
A. Check the license on the ESXi host
B. Ensure that the management network is correctly configured and reachable
C. Restart the manaqement aqents on the ESXi host
D. Use the vSphere Client to review the host's network settings
E. Verify the network configuration on the ESXi host
正解:B,C,E
解説: (Pass4Test メンバーにのみ表示されます)
質問 8:
An Administrator is tasked with setting up a new workload domain with VMware Cloud Foundation. The workload domain will have the following configuration:
vSphere with Tanzu to support Kubernetes workloads
NSX for container and virtual machine networking
Aria Operations will be configured for monitoring of the infrastructure Which three steps should be taken to complete the installation and configuration of this workload domain?
(Choose three.)
A. Integrate IaaS Control Plane with the existing vCenter Server.
B. Deploy the Supervisor Cluster for IaaS Control Plane.
C. Install Aria Operations agents on all ESXi hosts.
D. Configure NSX segments for Kubernetes namespaces.
E. Enable workload management in vCenter Server.
正解:B,D,E
解説: (Pass4Test メンバーにのみ表示されます)
924 お客様のコメント





上嶋** -
先日貴社より問題集を購入しました。問題集試験対策には本当に信頼している。