A customer is acquiring a POWER7+ system with 6 IBM i LPARs. A requirement exists to perform simultaneous backups of 3 of the partitions. Production schedules will cause the time of the backups to vary significantly on a daily basis.
Which configuration would support the requirements of the customer with least operator interaction?
A. Configure each LPAR with a fibre tape adapter. Configure a tape library with 3 tape drives.
Configure a fibre switch for tape library and drive connectivity Use BRMS and the BRMS network
feature to manage backups and media.
B. Configure a VIO Server (VIOS) LPAR with 1 fibre tape adapter. Configure a tape library with 1
tape drive.
Configure Virtual SCSI to enable each IBM i LPAR to connect to the VIOS. Configure backups to
use virtual tape catalogs hosted by VIOS.
C. Configure an LPAR with 1 fibre tape adapter. Configure a tape library with 3 tape drives.
Use iSCSI to channel the 5 other LPARs through the LPAR that owns the fibre tape adapter Use
BRMS and the BRMS advanced function feature to manage backups and media.
D. Configure the system with 3 fibre tape adapters. Configure a tape library with 3 tape drives. Use
the HMC scheduler to move the adapters. Use BRMS and the BRMS network feature to manage
backups and media.
正解:A
質問 2:
A customer has 3 IBM 7.1 partitions running on a POWER7 740. One partition has a dedicated 4Gb Fibre Channel adapter to connect to the tape library, the other two partitions have a shared 4Gb Fibre Channel adapter to connect to the same tape library. All partitions are connected to a VIO Server to use external storage.
The overhead of needing to switch the shared 4 Gb Fibre Channel adapter is a burden and the customer wants a solution for this.
Which of the following is needed?
A. NPIV and Technology Refresh 6
B. An additional 4Gb Fibre Channel adapter
C. Backup, Recovery and Media Services Network feature
D. NPIV and Technology Refresh 2
正解:B
質問 3:
A customer needs external storage attached to their Power Systems server. They are limited in regard to the amount of floor space and energy/cooling that can be provided for the external storage device.
Which IBM Systems Storage product will work best with this customer's limitation?
A. Storwize V7000
B. D58899
C. XIV
D. D58870
正解:A
質問 4:
A customer has a 1-core POWER6 520 running 7.1 TR6, with 6 internal 3,5 inch 70GB drives all in the system ASP.
The customer has just purchased a 4-core POWER7+ 720. The customer has an HMC attached to both machines.
Which of the following upgrade methods is supported?
A. Save ASP Data on the current machine Migrate the Load Source from the POWER6 520 to the POWER7+ 720 Restore ASP Data on the new machine.
B. Perform a full system save of the POWER6 520 Restore the saved data to the POWER7+ 720
C. Install an EXP12S on the POWER7+ 720 and move the POWER6 520 disks to the expansion unit Use the HMO change the POWER7+ 720 to IPL from the EXPI2S
D. Remove the 6 disks from the POWER6 520 CEO Install the disks into the POWER7+ 720 CEO IPL the POWER 7+ 720
正解:B
質問 5:
A customer will be upgrading to a new POWER7+ server running IBM i 7.1. This customer is currently running IBM i 6.1 and uses AnyNet for SNA connectivity over TCP/IP. What must be configured to allow this customer to continue to receive IBM support for problems which may occur with the TCP/IP-based SNA connectivity?
A. EtherChannel
B. Converged Network Adapters
C. Virtual IP Addressing (VIPA)
D. Enterprise Extender
正解:D
質問 6:
Which of the following is one of the benefits provided by the integrated storage management capability of IBM i?
A. Provides disk protection such as RAID-5, RAID-6, Hot-Spare or Mirroring
B. Removes the requirement for redundant disk cache
C. Allows for quick adaptation of new storage innovations such as Solid State Drives
D. Eliminates the need to reorganize DB2 objects
正解:C