A System x prospect is very concerned about downtime and ask for the ability to hot swap internal drives. Which of the following blade servers offer hot swap internal hard drives?
A. HS21
B. HX5
C. HS22V
D. HS23
正解:D
質問 2:
A client wants to purchase a PureFlex with two Flex Chassis. Which of the following conversations should you have with your client from a logistical perspective before you settle on this configuration?
A. Are they capable of receiving and moving to their datacenter the 42U populated rack that will be shipped.
B. Who is their preferred local carrier to ensure that carrier delivers the equipment.
C. Do they want to purchase and use an FSM as that will be shipped separately and will be installed on site.
D. Do they want the equipment racked and cabled at the IBM factory before it is shipped to them.
正解:A
質問 3:
A client has stand-alone x86 servers running Windows 2003 and Red Hat Linux 5. The client does not use any server virtualization today. The customer plans to virtualize their environment. Which of the following will accomplish this conversion?
A. PowerVM to convert current images to Linux KVM virtual images
B. VMware vCenter Converter to convert current images to VMware ESX virtual servers
C. PlateSpin Migrate to convert current images to Citrix XenServer virtual images
D. Symantec Ghost to restore current images as physical images on the new System x servers
正解:B
質問 4:
On arrival of their new x3650 M4 servers, a client wants to perform a burn in test of their server for 24 hours to make sure none of the components fail. Which of the following IBM tools can the client use to perform these tests?
A. DSA
B. ToolsCenter
C. ASU
D. IBM Systems Director
正解:A
質問 5:
A System x technical specialist has a prospective customer who is excited about PureFlex and is working on configurations for a large complex opportunity. During the engagement the customer has changed the design several times and has significantly increased the scope. What steps should the technical specialist take to make sure the customer is satisfied with the solution?
A. Engage Techline to assess configurations and assist in preparing for a TDA
B. Perform knowledge transfer of design requirements with the customer
C. Request Techline create configurations
D. Request Techline to perform an on site TDA
正解:A
質問 6:
A customer has a legacy x86 deployment on physical servers. What benefit do server hypervisors such as VMware offer to preserve legacy workloads?
A. User-controlled CPU frequencies allow slower legacy hardware timings to be preserved.
B. Legacy x86 CPU models can be emulated allowing operating system compatibility.
C. Selected legacy operating systems can be hosted on new hardware which are not natively supported
D. Virtualized CPU cores facilitate reduced licensing costs for legacy operating systems.
正解:C