An existing IBM i customer with a POWER6 520 is planning to move to POWER7I but wants to understand the differences between running IBM i on a PureElex compute node compared to a new POWEP7 720 server.
Which of the following describes a key consideration for this customer related to running IBM i on a PureFlex compute node?
A. Punning IBM i on a PureFlex compute node requires VIO Server to provide all virtualized I/O resources.
B. IBM i on a PureFlex compute node requires dedicated physical adapters for all I/O resources.
C. The integrated storage node is a requirement for storage for a compute node running IBM i.
D. Systems Director VMControl management software is required for compute node management.
正解:A
質問 2:
A customer is running IBM i 7.1 on a Power 720 and needs to track sign-on activity. Which of the following should be recommended?
A. IBM i Security Audit Journal
B. IBM i Security Assessment Tool (iSAT)
C. IBM i Risk Check Tool
D. Tivoli Advanced Audit for IBM i
正解:A
質問 3:
Which customer requirement is supported by WebSphere Application Server- Express?
A. They want to run applications developed in Weblogic on IBM i.
B. They require an affordable, ready4o-go solution, to build dynamic Web sites and applications.
C. They need to improve the performance of web based applications accessed from IBM i.
D. They need a distributed object caching environment for elastic scalability in IBM i SmartCloud environments.
正解:B
質問 4:
What is a key customer benefit of a Technology Refresh?
A. A Technology Refresh includes IBM engineer services for implementation, reducing risk to customers upgrade processes.
B. A Technology Refresh requires no system down time to implement.
C. A Technology Refresh may provide new functions, performance improvements and I/O support.
D. A Technology Refresh replaces the need to install PTF5.
正解:C
質問 5:
A customer has a Power 720 with 2 IBM i partitions. The production partition has 30 concurrent users during office hours with 2 users that work outside office hours. The development partition has 3 part time users which work during office hours.
What is the minimum number of IBM i user licenses that the client needs?
A. 32
B. 33
C. 30
D. 35
正解:B
質問 6:
A customer has IBM i, AIX and Linux on Power Systems and Linux on x86. The customer is refreshing their infrastructure and might drop IBM i as they cannot maintain management skills for all their different virtualization software.
How can this issue be addressed?
A. The PowerVM roadmap shows virtualization solutions for IBM i, AIX and Linux on Power Systems and Linux on x86.
B. IBM i can host and manage AIX and Linux partitions, eliminating the need for virtualization skills on x86.
C. Fewer virtualization skills are required on IBM i because LPAP creation and management are integrated into the operating system.
D. The IBM i roadmap offers FSM, providing a single point of management for IBM i, AIX and Linux on Power Systems and Linux on x86.
正解:D
質問 7:
Which resource or tool can assist a sales representative in sizing an SAP installation on IBM i?
A. Techline
B. SAP's Comparison Guide
C. Workload Estimator
D. IBM Software Group
正解:A
クリック」


0 お客様のコメント