A new project is in the planning phase. The business owner believes that, since the timeline is aggressive, requirements elicitation should begin as soon as possible.
Which activity should the business analyst initiate before beginning requirements elicitation?
A. Draft a high-level data model.
B. Prepare the requirements traceability matrix.
C. Define how the solution will be evaluated.
D. Document how the relevant systems interact.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
Prior to the design phase, the project team needs to conduct a requirements review with the customer. To prepare for the review, it would be best for the team to:
A. start designing the product to impress the customer with the amount of progress achieved early in the project.
B. evaluate the requirements and highlight those that cannot be met or need to be deferred.
C. prepare a test procedure for the product to discuss at the requirements review.
D. request a contract amendment to delete any requirements from the contract that will be difficult to meet.
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
A business analyst is reviewing a discrepancy report after a test session. The discrepancy report has revealed a defect that the business analyst must address.
Which of the following criteria should the business analyst use to identify the appropriate response to the defective test result?
A. Verify that the corresponding requirement was appropriately signed off by the requesting stakeholder.
B. Perform an impact analysis and open a change request to include the revised requirement in the next baseline.
C. Determine if the defect is in the solution developed, in the original requirement, or in the test case.
D. Inspect the requirements traceability matrix to verify if the requirement is connected to a use case.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 4:
A business analyst has been assigned to a project to implement a new phone system for a customer call center.
The business analyst will need to create a business case.
Which of the following components will the business analyst use as input to the business case?
A. Project timeline
B. Project scope
C. Product scope
D. Work breakdown structure
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
A business analyst captures an application's current limitations and consults with end users to identify new features for the next version.
What can be used to analyze this information and determine project scope?
A. Root cause analysis
B. Capability table
C. As-is process
D. Requirements traceability matrix
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
Kazuki -
調べてみたのですが、試験会場がそれほど多くないのは気になります。Pass4Testの問題集を何個か購入しましたが、内容的には良かったと思います。