Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.
A. Release the transport request containing the modification adjustment.
B. Assign the transport request as a modification adjustment transport.
C. Manually activate the adjusted dictionary objects.
D. Create new versions of the objects you need to adjust.
正解:B,D
質問 2:
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?
A. Silent data migration (SDM)
B. Shadow on target creation
C. Downtime conversion
D. Downtime migration
正解:D
質問 3:
When using the DMO of SUM, which files can be handled by SUM in the download directory? Note:
There are 2 correct answers to this question.
A. MIGRATE_DT_DUR.XML file from a previous run
B. Breakpoint configuration file SAPUPPHAS.BRK
C. Parameter file SAPup_add.par
D. Stack XML file calculated by the maintenance planner
正解:A,D
質問 4:
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtime-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.
A. Conversion
B. Software update
C. Migration
D. Main import
正解:A,C
質問 5:
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.
A. You can find the optimal number of parallel R3load processes by monitoring host performance.
B. You can verify that the content of the download directory matches the stack XMML file.
C. You can obtain migration duration files from a previous benchmark run that can be used to optimize the next runs.
D. You can record the modification adjustment during migration and use the transports in the next runs.
正解:A,C