Which statement below best describes how to change a worker node to a gateway node?
A. By reinstalling the Service Manager on that node and configuring it to run as a gateway node.
B. By changing a property of the node and the domain.
C. By changing a property of the node and setting each service that runs on that node to Primary node
D. By changing a property of the node.
正解:D
質問 2:
Which of the following statements is true about running a PowerCenter workflow?
A. The Data Transformation Manager (DTM) process starts the PowerCenter Integration Service process to run each Session and Command task within a workflow.
B. The PowerCenter Integration Service process starts and locks the workflow and runs the workflow tasks.
C. The Data Transformation Manager (DTM) process starts and locks the workflow and runs the workflow tasks.
D. PowerCenter Invokes the Data Transformation Manager (DTM) only when the developer saves a mapping.
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
If you attempt to delete a user who is the owner of a repository folder, what will happen?
A. The folder is deleted.
B. You will be prompted to assign another owner to the folder.
C. This operation is not allowed.
D. The folder becomes owned by Administrator.
正解:D
質問 4:
How are license keys obtained for Informatica products?
A. License keys can be generated on-site using the mfasetup.sh script.
B. As a separate download.
C. Encoded on the install CD.
D. License keys can be generated on-site using your product code and the informatica Administrator.
正解:B
質問 5:
Which step(s) must be followed to make a copy of the PowerCenter repository metadata?
Assume that the source repository is in a separate domain from the new repository.
A. Backup the source repository to a file 2. Create a Repository Service for the new repository that has no tables 3. Restore the backup file to the new repository
B. Use the "Copy Contents" feature in the Administrator Tool
C. Create a Repository Service for the new repository that has no tables 2. In the Repository Manager Tool, click and drag the source repository to the new repository
D. Backup the source repository to a file 2. Create a Repository Service for the new repository that has tables 3. Restore the backup file to the new repository
正解:A
質問 6:
Which statement is true regarding object copy across folders in the Repository Manager?
A. You can copy an object even though it has been checked out or has a write-intent lock.
B. The Repository service will lock the repository database until the objects have been copied.
C. You must have write permissions in both the origin folder and the destination folder.
D. It is best practice to export the objects as XML prior to performing the copy operation.
正解:B
質問 7:
What is the purpose of operating system profiles?
A. To allow two or more Integration Services to run a single workflow on two or more different nodes with different operating systems.
B. To allow two or more Integration Services to run on the same node under differed operating system users.
C. To allow two or more workflows to run on the same node under different operating system users.
D. To allow two or more workflows to run on the same node while accessing different database connection users.
正解:A
宫原** -
必ず合格したい場合は細かな部分まで網羅してあるPR000007問題集