最新なIBM A2180-608問題集(65題)、真実試験の問題を全部にカバー!

Pass4Testは斬新なIBM WebSphere A2180-608問題集を提供し、それをダウンロードしてから、A2180-608試験をいつ受けても100%に合格できる!一回に不合格すれば全額に返金!

  • 試験コード:A2180-608
  • 試験名称:Assessment: IBM WebSphere Process Server V7.0, Deployment
  • 問題数:65 問題と回答
  • 最近更新時間:2024-04-11
  • PDF版 Demo
  • PC ソフト版 Demo
  • オンライン版 Demo
  • 価格:12900.00 4999.00  
質問 1:
A deployment professional is using the Common Base Event Browser to diagnose a problem with an application. After login, an error message is displayed when clicking the "Get events" button. The deployment professional checks that the server is available and that the application has been started on the server. What is the cause of the error message?
A. The messaging engines have not been started.
B. Insufficient authority to access the CEI bus.
C. The application deployed did not have event generation enabled.
D. The Common Event Infrastructure (CEI) server is unavailable.
正解:D

質問 2:
A consultant is meeting with a client which is migrating from an evaluation single server instance of WebSphere Process Server to a production ready topology. The deployment professional is asked to make suggestions related to the configuration of a database to be used by the Business Process Container. When considering the configuration of the Business Process Choreographer into a production system, which statement is correct?
A. A separate database shared with a messaging engine should be used.
B. The embedded Derby database should be used.
C. Only DB2 should be used.
D. A separate database should be used.
正解:D

質問 3:
Thousands of parallel business processes are running in a production environment. The database administrator monitoring the Business Process Choreographer database observes that the amount of runtime data is filling up the available space and will reach the space limits very soon. What action should the deployment professional take to address the problem?
A. Review the status of all process instances using the Business Process Choreographer
Explorer.
Manually delete all process instances that are in completed status.
B. Review the database records and identify all work items for completed process instances.
Advise the database administrator to remove all work item records for completed process
instances.
C. Verify if process instances in the database are completed and are not needed for any reporting.
Automate the process deletion using the deleteCompletedProcessInstances script.
D. Verify if the business integration applications in the environment provide different versions for
business processes.
Remove all unnecessary process templates using the deleteInvalidProcessTemplate script.
正解:C

質問 4:
A new customer to WebSphere Process Server has used adapters in several modules. There are many more modules in development that use adapters on their way to production. The customer is worried about resource consumption when all the modules are running. What should the deployment professional investigate about the use of the adapters?
A. Are technology adapters or EIS adapters used?
B. Is the same type of adapter used at different version levels?
C. Is the same connection pool used for each of the adapters?
D. Is the same type of adapter used more than once?
正解:D

質問 5:
A company's development department consists of many developers working on the same business integration applications and shared resources. Before an application was deployed on WebSphere Process Server, the chief developer consolidated all resources and provided the application EAR file to the deployment professionals. Overtime, the number of inconsistent copies managed by different developers increased. A new shared repository for all developers will be introduced.
How can the deployment professional benefit from this approach?
A. The deployment professional can use the ejbdeploy tool to compile the SCA application in the repository.
B. The deployment professional can now use the serviceDeploy tool for both, compiling the new application in the repository and deployment on the production environment.
C. An Apache Ant script using the corresponding serviceDeploy tool task allows the deployment professoinal to automate the compilation and deployment process.
D. All application resources for the new application can be retrieved from the repository and compiled for deployment using the serviceDeploy tool.
正解:D

質問 6:
A company has implemented for the first time a business integration application which uses Business Process in a clustered WebSphere Process Server environment. Now the deployment professional needs to monitor the Business Process and while doing so, encounters an issue opening the process state view of the Business Process in the Business Process Choreographer Explorer. What is the cause?
A. The Process Template of the business process has been shut down.
B. Endpoints for the Business Flow Manager REST API's are not set properly.
C. One of the members of the cluster on which the Business Process is deployed is down.
D. A new version of Business Process is introduced with significant enhancements.
正解:B

弊社のWebSphere問題集を利用すれば必ず試験に合格できます。

Pass4TestのIBM A2180-608問題集はIT認定試験に関連する豊富な経験を持っているIT専門家によって研究された最新バージョンの試験参考書です。IBM A2180-608問題集は最新のIBM A2180-608試験内容を含んでいてヒット率がとても高いです。Pass4TestのIBM A2180-608問題集を真剣に勉強する限り、簡単に試験に合格することができます。弊社の問題集は100%の合格率を持っています。これは数え切れない受験者の皆さんに証明されたことです。100%一発合格!失敗一回なら、全額返金を約束します!

一年間無料で問題集をアップデートするサービスを提供します。

弊社の商品をご購入になったことがあるお客様に一年間の無料更新サービスを提供いたします。弊社は毎日問題集が更新されたかどうかを確認しますから、もし更新されたら、弊社は直ちに最新版のA2180-608問題集をお客様のメールアドレスに送信いたします。ですから、試験に関連する情報が変わったら、あなたがすぐに知ることができます。弊社はお客様がいつでも最新版のIBM A2180-608学習教材を持っていることを保証します。

弊社は無料でWebSphere試験のDEMOを提供します。

Pass4Testの試験問題集はPDF版とソフト版があります。PDF版のA2180-608問題集は印刷されることができ、ソフト版のA2180-608問題集はどのパソコンでも使われることもできます。両方の問題集のデモを無料で提供し、ご購入の前に問題集をよく理解することができます。

簡単で便利な購入方法ご購入を完了するためにわずか2つのステップが必要です。弊社は最速のスピードでお客様のメールボックスに製品をお送りします。あなたはただ電子メールの添付ファイルをダウンロードする必要があります。

領収書について:社名入りの領収書が必要な場合には、メールで社名に記入して頂き送信してください。弊社はPDF版の領収書を提供いたします。

弊社のA2180-608問題集のメリット

Pass4Testの人気IT認定試験問題集は的中率が高くて、100%試験に合格できるように作成されたものです。Pass4Testの問題集はIT専門家が長年の経験を活かして最新のシラバスに従って研究し出した学習教材です。弊社のA2180-608問題集は100%の正確率を持っています。弊社のA2180-608問題集は多肢選択問題、単一選択問題、ドラッグ とドロップ問題及び穴埋め問題のいくつかの種類を提供しております。

Pass4Testは効率が良い受験法を教えてさしあげます。弊社のA2180-608問題集は精確に実際試験の範囲を絞ります。弊社のA2180-608問題集を利用すると、試験の準備をするときに時間をたくさん節約することができます。弊社の問題集によって、あなたは試験に関連する専門知識をよく習得し、自分の能力を高めることができます。それだけでなく、弊社のA2180-608問題集はあなたがA2180-608認定試験に一発合格できることを保証いたします。

行き届いたサービス、お客様の立場からの思いやり、高品質の学習教材を提供するのは弊社の目標です。 お客様がご購入の前に、無料で弊社のA2180-608試験「Assessment: IBM WebSphere Process Server V7.0, Deployment」のサンプルをダウンロードして試用することができます。PDF版とソフト版の両方がありますから、あなたに最大の便利を捧げます。それに、A2180-608試験問題は最新の試験情報に基づいて定期的にアップデートされています。

IBM Assessment: IBM WebSphere Process Server V7.0, Deployment 認定 A2180-608 試験問題:

1. A deployment professional is asked to clean up several failed events that belong to a long running business process in a clustered WebSphere Process Server environment. These failed events were created as a result of an identified outage of the backend database. Several instances of this business process were created during this outage and have been deleted. What corrective action should the deployment professional take to clean up these failed events?

A) Create a custom program and use the Business Flow Manager API queryHldQueueMessage to query all the events and deleteHldQueueMessage to discard the failed events.
B) Use the configRecoveryForCluster command to specify a cluster, that is configured to manage failed events.
C) Create a custom program and use the queryFailedEvents method of the FailedEventManager interface to query all the events associated with this business process, and use the discardFailedEvents method.
D) Find the events in the Failed Event Manager that belong to the Business Flow Manager hold queue and replay the Hold queue messages.


2. An application is processing a sales order between two SCA modules. The business process requires that all invocations between the modules are performed in a specific order. A runtime problem on one of the asynchronous invocations caused the application to fail and the processing stopped for one of the transactions. What should a deployment professional do to solve the problem?

A) Enable the store-and-forward feature for the application and the events will be processed automatically if the runtime problem is solved.
B) Use the esAdmin tool to manually release all locks of the failing application module and restart the application.
C) Identify the failed sequenced event related to the asynchronous invocation of the calling module and resubmit the event.
D) Identify the failed business process invoke activity and restart the activity to resubmit the event and complete the transaction.


3. A business integration application makes use of a non-interruptible business process which is invoked synchronously to update a backend SAP application and a data warehouse deployed on the DB2 database. Under peak loads, the business process performs poorly. The deployment professional is approached to fine tune the resources for better performance. What should be the appropriate tuning settings?

A) Reduce the number of transaction boundaries within the business process and try to use parallel execution paths.
B) Increase the number of connections in the connection pool of the JDBC data source to connect to DB2 database.
C) Replace the DB2 database data store for the business process with file store.
D) Increase the sib.msgstore.discardableDataBufferSize default value to hold the data for which the quality of service attribute is best effort non-persistent of the business process.
E) Increase the Java heap size but keep it low enough to avoid heap swapping.


4. A telecommunications company is running on WebSphere Process Server 6.2 and intends to upgrade to WebSphere Process Server V7.0. In WebSphere Process Server 6.2, the backend systems are SAP applications and the corresponding WebSphere adapters are installed. What are the key sequential steps that the deployment professional needs to take to upgrade to WebSphere Process Server V7.0?

A) Create target profiles with all components -> Uninstall WebSphere Adapter for SAP applications from the 6.2 environment -> Use BPM profile migration command line utility
B) Install Migration Target -> Backup Source -> Apply interim patch on SAP Adapters -> Migrate using profile migration utility
C) Create Target profiles -> Backup source profile -> Migrate using Profile Management tool -> Migrate database manually
D) Create Migration Target -> Augment target profiles with WESB and Process Server -> Migrate using BPM command line utility


5. During the design of a large-scale high-volume topology, a deployment professional is consulting with a client on the planned design and configuration of the databases required for the messaging resources. During this discussion the deployment professional notes that it would be preferable to configure a separate database for the Business Process Choreographer (BPC) messaging engine. What is a reason for making such a suggestion?

A) Database logging could become a performance bottleneck.
B) The separate database is created automatically in a network deployment environment.
C) Shared databases between the BPC and the SCA bus are not supported in production environments.
D) All of the components require the database schema to be named MEDBPM00.


質問と回答:

質問 # 1
正解: D
質問 # 2
正解: C
質問 # 3
正解: B、E
質問 # 4
正解: A
質問 # 5
正解: A

817 お客様のコメント最新のコメント

Ozaki - 

情報システムに関連した仕事をする前に一通り目を通しておくといろいろA2180-608参考になると思います。

石田** - 

過去問題集の自動採点はかなり重宝します。知識は勉強してからチャレンジもあります

北野** - 

なんといっても解説が充実している。
A2180-608問題集は丁寧に解説されている。
問題を単純に解いていく問題集に比べて理解しながら学習が進められる。

有沢** - 

おお ありがとうございます!
Pass4Testの問題集は助かりました。A2180-608の本場試験に合格致しました。

Obata - 

何を理解してのぞむべきかがわかり仕組みを理解していないと解けないものがありますが、それらを仕分けて掲載されているので受かるためには何を覚えました

関谷** - 

必要な知識をしっかり身に付けることができる。これ問題集一つで合格できるって本当ですね。

Nishimura - 

IBMの問題集はとにかくわかりやすい!
受かることを優先しようとおもえば、模擬試験を反復すれば、このA2180-608で大丈夫でした!ありがとうございます!

尾*绫 - 

知識をさらに強化して試験に合格しました。こちらのテキストは更にもう一歩踏み込んで勉強したい方向けのように思います。A2180-608の問題集で合格しましたぜ

Hayano - 

Pass4TestのA2180-608問題集は「わかりやすさ」「見やすさ」「網羅性」という加点ポイントがあって受かないわけがないよ。Pass4Testさんはいつも信用しております。

坂井** - 

出題分野を体系的に幅広く網羅し、側注付きでA2180-608理解しやすい参考書だ。

小畑** - 

試験の全範囲を網羅するPass4TestのA2180-608問題集を使って勉強し、今回も無事合格です。

塩沢** - 

全力を尽くして勉強していただきます。A2180-608学習教材は有効です。そして、合格率は高いです。

星野** - 

IBMの問題集は試験同様の内容なので、冷静に落ち着いてA2180-608試験に臨むことができます。

远野** - 

本当に使えて、本番試験にも無事合格した。地味にすげぇ。苦手な過去問を解けるようになっていることが嬉しいです。

田中** - 

短時間での効率よい学習が可能。みっかでA2180-608合格だ。Pass4Testまたきますね

中川** - 

Pass4Testお陰様でいい問題集を出会いました。感謝です。

メッセージを送る

あなたのメールアドレスは公開されません。必要な部分に * が付きます。

Pass4Test問題集を選ぶ理由は何でしょうか?

品質保証

Pass4Testは試験内容に応じて作り上げられて、正確に試験の内容を捉え、最新の97%のカバー率の問題集を提供することができます。

一年間の無料アップデート

Pass4Testは一年間で無料更新サービスを提供することができ、認定試験の合格に大変役に立ちます。もし試験内容が変われば、早速お客様にお知らせします。そして、もし更新版がれば、お客様にお送りいたします。

全額返金

お客様に試験資料を提供してあげ、勉強時間は短くても、合格できることを保証いたします。不合格になる場合は、全額返金することを保証いたします。

ご購入の前の試用

Pass4Testは無料でサンプルを提供することができます。無料サンプルのご利用によってで、もっと自信を持って認定試験に合格することができます。