You have created a multi-participant step in a workflow with two responses 'Approve' and 'Reject'.
The business requirement states that the workflow should only continue to the approval flow if the majority of the performer approves the task. Which of the following route logic could you use to test this?
A. COUNT(Approve) > COUNT(Reject)
B. ANY(Approve)
C. COUNT(Reject) > COUNT(Approve)
D. ALL(Approve)
正解:A
質問 2:
Which FileNet P8 Process Simulator configuration is supported?
A. Using a single IBM FileNet Case Analyzer instance for both production and simulation activity.
B. Collocating Process Simulator and Case Analyzer servers where Case Analyzer is used in a production context.
C. Storing both production data and simulation data in the same database.
D. Collocating Process Simulator and Case Analyzer servers where Case Analyzer is used in a simulation context.
正解:D
質問 3:
Why is it important to purge Process Engine event log information from the database on a regular basis?
A. To help Case Analyzer obtain the Process Engine events from the Event log.
B. To prevent the build up of logon- logoff event types
C. Statistical data can become meaningless if not maintained.
D. Event logs can grow quickly and negatively impact system performance.
正解:D
質問 4:
Which of these commands is used to stop the Process Engine Manager manually on an AIX environment?
A. vwtaskman
B. stoppemgr
C. killfnsw
D. initfnsw -y stop
正解:B
質問 5:
If you assign a group to the Configuration group in the Process Task Manager Security tab what can the members of the group do?
A. The members of the group can assign Access Roles to users and groups.
B. The members of the group can modify any workflow map in Process Designer.
C. The members of the group can make configuration changes to the workflow database.
D. The members of the group can modify Site Preferences.
正解:C
質問 6:
What can the vwlog utility do?
A. It can display the database views.
B. It can move log records and purge log data from the Process Engine database.
C. It can display the load on the system.
D. It can show the step processors that are configured in the workflow database.
正解:B
質問 7:
Where do the IBM FileNet Case Monitor dashboards get their data from?
A. Active cases, tasks, work Items, workflows
B. FileNet System Monitor log files
C. Process Engine event logs
D. Content Engine Solution folders
正解:A
質問 8:
Where is the Process Engine system log file, pesvr_system.log, located in a FileNet BPM 5.0 Process Engine server's file system?
A. in the /fnsw/local/logs directory
B. In the /tmp directory
C. In the <Process_Engine_installation_directory>/data/pesvr.
<Process_Engine_virtual_server_name>/logs directory
D. In the fnsw user's home directory
正解:C