A client wants to purchase a POWER77+ server with the following requirements:
-Two PCIe 12X I/O drawers -Partition scalability to 320 LPAPs
Which system supports the client needs?
A. Power Linux 740
B. Power 740
C. Power 720
D. Power 710
正解:B
質問 2:
A customer wants to install the operating system on a new partition from the optical media pool of the virtual I/O server. What needs to be configured to be able to use this media pool?
A. vSCSI on both the partition and the VIO Server
B. NES on the VIO Server
C. NPIV on both the partition and the VIO Server
D. SCSI on both the partition and the VIO Server
正解:A
質問 3:
A customer is considering server consolidation and I/O virtualization in the DMZ environment. Servers on multiple VLAN5 will be consolidated onto a single physical server, and will need to communicate with multiple VLANs outside the sewer over a single shared Ethernet adapter in the VIO Sewer (VIOS).
Which of the following is a requirement?
A. Assign an IP address to the Shared Ethernet Adapter.
B. Enable Shared Ethernet Adapter failover.
C. Implement Network Interface Backup with pvlans.
D. Enable the IEEE 802.1Q standard on the virtual Ethernet adapter.
正解:D
質問 4:
Assuming that necessary requirements have been satisfied, which RAS feature can ensure that critical workloads can remain active in the event of a processor core failure?
A. Dynamic Logical Partitioning
B. Partition Availability Priority
C. Live Partition Mobility
D. Dynamic Platform Optimization
正解:B
質問 5:
A customer is evaluating solutions for IT service management, cloud and virtualization management, asset and facilities management. Which of the following IBM software brands should be recommended?
A. Tivoli
B. Info sphere
C. Websphere
D. Rational
正解:A
質問 6:
A customer needs to virtualize their storage using both vSCSI and NPIV in their SAN environment.
What is the minimum number and type of HBAs that need to be configured for the VIO Server?
A. Two 8Gb HBAs
B. One8Gb HBA
C. TW0 4Gb HBAs
D. One 4Gb and one 8Gb HBA
正解:B
質問 7:
A customer wants to implement 8 LPARs, 4 of IBM i and 4 of AIX. The customer wants the new systems to be modular, configured to support their needs, and have room to expand if needed.
Which system is the minimum needed to support the customer requirements?
A. PureFlex p460
B. PureElex p220
C. PureFlex p24L
D. PureElex p260
正解:D